ICS 13.100 C 78 CSPSTC 企业安全生产双重预防机制建设规范 Specification on double prevention mechanisms construction for enterprises safety production (征求意见稿) 中 国 科 技 产 业 促 进 会 团 体 标 准 T/CSPSTC X-2018 2018-xx-xx 发布 2018-xx-xx 实施 中国科技产业促进会发 布 目 次 前 言...............................................................................II 1 范围..................................................................................1 2 规范性引用文件........................................................................1 3 术语和定义............................................................................1 4 建设原则..............................................................................1 5 建设流程..............................................................................2 6 责任要求..............................................................................7 附 录 A (规范性附录) 安全检查表法(SCL)............................................8 附 录 B (规范性附录) 工作危害分析法(JHA).........................................10 附 录 C (规范性附录) 常用风险评估方法..............................................12 附 录 D (规范性附录) LEC 评价法(格雷厄姆评价法)..................................14 附 录 E (规范性附录) 风险判定矩阵法................................................15 附 录 F (规范性附录) 安全风险四色分布图和作业安全风险比较图........................17 参考文献...............................................................................18
分类:安全培训材料 行业:建筑加工行业 文件类型:Word 文件大小:372 KB 时间:2025-08-13 价格:¥2.00
上下水施工合同 甲方单位名称:新顺峰肥牛火锅 乙方单位名称: 为维护甲乙双方的共同利益,保证施工质量和安全生产,保持良好的工作 秩序和施工场所的安全、卫生环境,经甲乙双方平等协商,签定本施工协议: 一、 施工的具体内容 1.施工项目:新顺峰肥牛火锅给、排水安装管路及疏通工程 。 2. 施工具体位置: 3.施工期限:2016 年 7 月 日至 2016 年 月 日 。 4.材料要求: 二、施工要求 1. 工程质量以及采用的原材料应符合国家现行施工验收规范(含国家或行 业安全技术标准)、以及甲方工程项目安全技术要求和需要,必须达到专业质量 检验评定的优良以上等级。 2.因乙方盲目蛮干、只求速度不按操作规程施工,造成工程质量不符合设 计安全技术要求、质量不合格,甲方可要求乙方停工或返工,返工费用由乙方 承担,由此造成之材料浪费及经济损失全部由乙方负责赔偿,工期不予顺延。 3. 乙方进场施工,须经甲方同意,并指定施工负责人,施工现场设立安全 监督,便于施工过程中的协调、联系。同时,在不影响甲方另外工作运行的前 提下,甲方需为乙方提供施工便利条件和服务。 4.乙方施工前,必须对场地安全监督施工人员进行安全教育,安全措施得 力,施工中因违章操作等原因造成意外的人身伤害或事故损失由乙方自行负责。 5.乙方获得甲方工程项目后不得转包给其他施工队,如甲方确认工程项目 有转包事实,甲方可要求停工或取消乙方施工权利,另找合作者。 6、乙方在施工过程中当天产生的垃圾尽量当日清理干净。施工结束后,乙 方应对施工现场彻底清理,做到工完、料尽、场地清。清理出的垃圾不能随意 堆放在甲方管理的场地内,否则可根据实际情况进行罚款、扣除部分甚至全部 风险抵押金。对外发生的污染、交通等意外事故由乙方负责。 7、施工期间,乙方员工不得酒后上岗。不得将与工作无关的闲杂人员带入 施工现场,不准聚众赌博,不准将易燃、易爆物品带入楼内。 三、违约责任: 1.如期按时或提前完成所有本项目的施工任务,若拖延工期,每延期一日, 按工程结算总价的 10%向甲方支付罚金。 2.施工延期三天以上,需要赔偿甲方经营期间的经济损失,即三天以上第 四天开始,每天赔偿总价的 10%+ 元/天 。 3.乙方使用劣质原材料,甲方有权拒绝付款,并要求赔偿事宜。 4. 若乙方无正当理由单方终止本责任书,除承担由此给甲方造成的经济损 失( 元/天)外,还应向甲方支付工程总造价 20%的违约金。 5. 若乙方违反本责任书之上述有关约定,不按工期竣工、质量达不到设计 规范或安全技术要求、存在较大安全隐患或发生安全事故以及发生其他导致本 责任无法履行的行为,甲方有权单方解除本责任书并要求乙方清场,乙方对该
分类:安全培训材料 行业:其它行业 文件类型:Word 文件大小:29 KB 时间:2025-08-22 价格:¥2.00
地铁施工安全协议书 甲方单位名称:深圳市安托山投资发展有限公司 乙方单位名称:中国水电深圳地铁 7 号线 7302 标项目经理部 一. 目的 为明确双方责任、依据《中华人民共和国合同法》及其它有关法律法规, 遵循平等、自愿、公平的原则,保证施工安全生产,保持良好的工作秩序和施 工场所的安全、卫生环境,经双方就本工程安全生产责任事项协商一致,签订 本协议。 二. 施工项目: 深圳市城市轨道交通 7 号线 BT 工程安托山站站前明挖区间。 三. 施工地点: 深圳市福田区北环大道南侧,安托山混凝土公司场地内。 四. 施工时间:以进场之日起,工期 24 个月。 五. 协议内容: 1、在不影响甲方安全生产的前提下进行,甲方须为乙方提供施工便利条件 和服务;在乙方施工期间,甲方不得以非正常理由阻碍施工; 2、乙方施工人员统一由乙方进行安全教育,进、出厂统一佩戴上岗证(工 作牌)或穿戴标有水电七局样式劳保服装,便于甲方辨识; 3、乙方按照设计图纸规划进行封闭围挡,在围挡内施工作业; 4、施工中因乙方责任引起本工程围挡范围内的人身伤害或事故损失应由乙 方负责;甲方人员未经乙方同意不得随意进入乙方施工围挡范围,若不听从劝 告导致发生的一切后果由甲方自行承担。在施工期间内因工作引起的厂区内的 矛盾纠纷由甲方和乙方协商处理; 5、乙方在厂区内爆破作业,应提前书面告之甲方并按深圳市公安局相关规 定和甲方要求做好安全防护,若发生因爆破引起的损失由乙方全部承担; 6、乙方施工车辆进、出厂需贴有中国水电统一标识,并将车辆资料(车牌 号)提交甲方备案;进入厂区内的乙方施工车辆实行限速管理,车速不大于 15km/h,甲方可监督检查,如发现有违规车辆及时向乙方提出整改要求; 7、甲方负责围挡出入口至南侧大门口的道路保洁和维护,负责该路段的交 通指挥疏导工作,确保乙方车辆顺畅安全通行;乙方负责南侧大门至侨香四道 的道路保洁和维护并确保车辆顺畅安全通行; 8、因地铁施工产生的噪音、爆破震动等引起的维稳工作由乙方负责解决; 9、乙方严格依据《电力设施保护条例实施细则》等有关规定,对在施工区 域内的电力等相关管线实施安全保护措施或迁改,如发生施工导致管线损坏引 起的所有损失由乙方承担; 10、其它未尽事宜由甲乙双方协商解决。 六、开挖、施工机械、车辆安全措施 安托山站前明挖区间采用桩撑支护形式进行开挖,围护结构采用φ1.5m 钻 孔灌注桩+5 道支撑,桩间采用φ0.6m 双重管旋喷止水。 1、开挖方案
分类:安全培训材料 行业:其它行业 文件类型:Word 文件大小:32.6 KB 时间:2025-08-22 价格:¥2.00
施工安全协议书 甲方单位名称: 联系电话: 乙方单位名称: 联系电话: 一. 目的 为维护甲乙双方的共同利益,保证施工质量和安全生产,保持良好的工 作秩序和施工场所的安全、卫生环境,经甲乙双方平等协商,签定本施工协议。 二. 施工项目: 三. 施工地点: 四. 施工时间: 五. 协议内容: 1、乙方进入幼儿园内施工,须经甲方领导同意,并指定施工负责人,施工 现场设立安全监督,便于施工过程中的协调、联系。同时,在不影响甲方安全 日常活动运行的前提下,甲方需为乙方提供施工便利条件和服务。 2、乙方施工前,必须对施工人员进行安全教育,并与甲方公司签定《施工 安全协议书》,安全协议书未签订工程项目不得开工装修;乙方获得甲方工程 项目后不得转包给其他施工队。 3、开工前,施工作业区域、安全防范措施和动火作业申请须经甲乙双方安 全监督管理部门审查通过; 4、 施工人员进入幼儿园必须统一穿戴劳保服装,特种作业人员还必须携 带特种作业操作证,便于甲方安全管理人员和上级主管领导检查; 5、乙方应在施工区域设置明显标志,对于时间较长的集中性施工项目要做 封闭处理,施工人员应在施工区域内活动,不得随意进入非施工区域,甲方人 员有权随时检查; 6、 施工队伍的安全防护器材必须配置到位,安全措施得力,否则将不得 开工作业;施工中因违章操作等原因造成意外的人身伤害或事故损失应由乙方 负责。 7、施工过程中如需使用水、电、气(压缩空气、天然气)等,施工单位必 须填写申请单,经甲方领导同意,由专业人员指定接水、电、气地点,电器线 路和管路连接规范,并由施工单位安装合格计量仪表后方可使用。所需费用由 施工单位负担; 8、 施工过程中如需动火作业,应根据动火级别由施工单位向甲方有关单 位、部门提出申请,经批准并确认达到动火条件、落实安全防范措施后方可进 行动火作业。动火作业过程中甲乙双方必须指派安全人员在现场监护; 9、 施工车辆进入幼儿园必须装有防火帽,车速不大于 5km/h,出厂必须经 门岗值班人员检查,出具经甲、乙方施工现场管理人员签字确认的出入幼儿园 物品放行单,方可放行; 10、 施工过程中甲方有权随时进行检查,有权制止违章作业,有权对违反 安全规定的行为进行处罚或责令施工队伍停工整顿。 11、乙方在施工过程中当天产生的垃圾尽量当日清理干净。施工结束后, 乙方应对施工现场彻底清理,做到工完、料尽、场地清。清理出的垃圾不能随 意堆放在甲方管理的场地内,否则可根据实际情况进行罚款、扣除部分甚至全 部风险抵押金。对外发生的污染、交通等意外事故由乙方负责;
分类:安全培训材料 行业:其它行业 文件类型:Word 文件大小:28.5 KB 时间:2025-08-22 价格:¥2.00
道路分部(分项)施工安全技术交底内容 (一)道路路基挖方施工安全技术要求: 1. 挖方施工区域必须设置专人进行交通管理,对人员、车辆、 机械实行统一指挥。 2. 人工挖土,前后应保持 1.5 米以上距离,左右应保持 1 米以上 距离;机动车辆和装载机配合挖土时,必须距离人工挖土面保持 5 米凡例上的距离。 3. 人机配合挖方施工,人员不准站在机械前进的工作面上,一 定要站在机械工作面以外。 4. 挖土机挖土时,人员不允许在机械回转半径内通过。并保证 一定的施工场地,施工范围内不准安排其它作业。 5. 运土汽车进入场地必须有专人指挥,以保证安全。 6. 压路机碾压时需要人工清理轮上粘土时,清土人员必须站在 村路机的后面清理。 7. 在挖填交接处或悬崖边缘进行挖土施工,必须保留 1 米以上 的安全距离。 8. 挖土时,必须自下而上分层开挖,压层厚度一般不得超过 1 米, 最厚不得超过 1.5 米。严禁掏底放崖而造成坍塌事故。 9. 两侧堆土时,堆土区必须留出人行通道;尽量避免靠墙堆土, 必须堆土时高度不得超过 1 米,并应设良好的排水沟管。 10.工休时,机械、人员不允许靠墙休息,以防发生坍塌伤人事故。 (二)道路路基填方施工安全技术要求: 1. 用斧头、镐头清理树根、杂草时,斧头、镐头前不允许站人。 2. 处理墓穴、枯井底部时,首先要排除周围的险情,采取必要 的安全措施,然后分层填筑。 3. 填方施工时,每侧均应宽于该层填筑坡角 50 厘米,以保证压 路机碾压时足够的安全距离。 4. 机械填土方时,应设立明显的分层和路边桩的标志,防止机 械施工时闪空。 5. 人工配合机械控制分层摊铺时,人工找平必须和机械保持一 定的安全距离。 6. 施工现场必须设立专人指挥,保证人工和机械安全施工。 7. 用电夯夯实时,接夯软线必须绝缘良好,启动、制动开关必 须灵敏安全,工作中不允许夯在电线上,防止发生发生确电事故。 8. 机械压实时,施工人员应站在压实作业面以外;碾压施工要 修整和检查作业面时,机械应停止工作。 (三)道路基层施工安全技术要求: 1. 化石灰、筛石灰时均应站在上风头,工人应穿工作服,戴上 口罩、手套、护目镜、防护帽和鞋盖等,防止石灰腐蚀皮肤。 2. 在居民区周围筛石灰前应用芦席或蓬布将区域进行围档隔 离。 3. 装运土石灰粉时,装车要轻、稳、防止飞扬;运送路上必须 盖上蓬布或塑料布,防止污染环境。 4. 机械拌和灰土时,现场必须有专人指挥,防止发生人员伤亡 事故。 5. 现场运料不能装载过满,以防沿路抛洒伤人。 6. 摊铺整平时,施工人员必须穿高腰鞋袜,防止石灰烧伤皮肤。
分类:安全培训材料 行业:物流仓储行业 文件类型:Word 文件大小:31.5 KB 时间:2025-08-28 价格:¥2.00
外来单位施工安全协议书 根据《安全生产法》和国家其他有关安全生产法律法规规范标准,按 照青岛市安全监督管理局安全生产属地化管理原则,为维护甲乙双方的共同利 益,保证安全生产和施工质量,保持良好的工作秩序和施工场所的安全、卫生 环境,经甲乙双方平等协商,签定本协议。 一、甲、乙双方安全、工程管理人员基本情况 甲方:青岛双桃精细化工(集团)有限公司平度分公司 工程负责人: 联系电话: 安全负责人: 联系电话: 现场代表: 联系电话: 安全员: 联系电话: 乙方(施工单位名称): 法人代表: 联系电话 安全负责人: 联系电话: 施工负责人: 联系电话: 安全员: 联系电话: 二、外来施工单位入厂前必须办理以下手续 1、持“工程施工合同”和“安全协议书”到分公司安全部办理有关手续。 2、持施工人员名单,组织全体施工人员到安全部接受规定内容的安全教育。 3、持施工队伍负责人及安全管理人员名单,特殊工种(电焊工、气焊工、 电工、起重工、架子工等)人员名单、证件到安全部登记备案。 4、持用工单位证明,到综合部办理外来务工人员临时出入证和工作卡。 三、外来施工单位现场作业前必须按规定办理以下手续 1、施工如需动火,必须向所在单位申请办理“动火证”,按甲方有关动火 证审批手续办理,落实各项措施后方可动火作业。 2、作业中如需破土、断路,必须按甲方有关规定办理“动土作业票”和“断 路联系票”,并按程序办理会签手续。 3、作业中如需进行爆破作业,必须制定爆破方案,提交公司工程管理部门 和安全保卫管理部门审查后,报请当地公安机关批准,签订爆破作业施工合同。 4、施工作业中如需接临时线,使用电气设备或电气工具,必须到生产部办 理“临时用电作业证”,并由甲方安排电工接用或拆除。 5、如需进入生产使用过的设备、容器内部进行作业和检修,必须由生产单 位的专职安全员办理“进入容器作业许可证”。 6、施工中如需使用甲方蒸汽、氮气、压缩空气等,必须报请生产部批准, 由生产部负责接用。 7、施工用水必须提出书面申请报生产部批准。 四、外来施工单位施工中必须严格遵守下列规定: (一) 乙方签订本协议前必须提供本项目健康、安全和环境管理(以下简 称 HSE 管理)方案,主要包括安全生产、环境保护、职业卫生、消防等内容: 1、本项目 HSE 的管理要求和实施方案; 2、本项目 HSE 专项费用及分解计划; 3、本项目 HSE 考核方案; 4、施工队伍负责人、安全管理人员名单;
分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:35.5 KB 时间:2025-11-03 价格:¥2.00
冶金企业烧结单元隐患排查策划(分配)表 一、 原料场 ............................................................................................................4 (一) 堆取料作业 .....................................................................................................4 (二) 翻车机作业 .....................................................................................................6 (三) 料场管理 .......................................................................................................6 (四) 皮带机作业 .....................................................................................................7 (五) 汽车料槽作业 ...................................................................................................8 (六) 上料作业 .......................................................................................................8 (七) 设备维护作业 ..................................................................................................10 (八) 卸料作业 ......................................................................................................11 (九) 洗轮机作业 ....................................................................................................12 二、 烧结 .............................................................................................................12 (一) 料槽作业 ......................................................................................................12 (二) 皮带作业 ......................................................................................................14 (三) 混料圆筒作业 ..................................................................................................15 (四) 烧结机布料作业 ................................................................................................16 (五) 单辊、齿辊作业、液压站作业 ....................................................................................20 (六) 带(环)冷机作业 ..............................................................................................21 (七) 锅炉作业 ......................................................................................................21 (八) 风机作业 ......................................................................................................22 (九) 电除尘、布袋除尘放灰作业、汽车放料作业 ........................................................................23 (十) 天车作业(电动葫芦、倒链)作业 ..................................................................................25 (十一) 发电作业 ....................................................................................................26 (十二) 冷(熔)筛筛分作业、热矿筛作业 ..............................................................................28 (十三) 破碎作业 ....................................................................................................28 (十四) 手持电动工具 ................................................................................................29 (十五) 电动三轮车 ..................................................................................................30 (十六) 熔剂添加 ....................................................................................................30 (十七) 配混作业(配料) ............................................................................................30 (十八) 气力输送作业 ................................................................................................31 (十九) 主控室作业 ..................................................................................................31 (二十) 设备点检、维护作业 ..........................................................................................32 (二十一) 电气作业(电气设备、电气室、电缆隧道、燃气(油)管道和钢制储罐) ..........................................35 (二十二) 危险作业 ..................................................................................................36 三、 检、维修作业 .....................................................................................................41
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:995 KB 时间:2025-11-21 价格:¥2.00
生产经营单位安全生产风险点登记表 风险点编号:YNZL-FD-02 填报时间:2016 年 8 月 20 日 风险点名称 锅炉 风险点 详细位置 窑头锅炉、窑尾锅炉 诱发事故类型 安全阀、水位表、压力表、报警和联锁保护装置等有损坏,入 口烟温过高、水位过低或过满、管道损坏等导致爆炸、烫伤 伤亡/财产 损失预测 灾难,数人死亡或造成很大财产损失 风险等级 二级 责任人 冯君武 风险管控 责任部门 生产品质部烧成车 间 手机号码 18669938975 采取管控 措施情况 1、严格检查相关设备设施及防保措施,锅炉安全附件及安全防 护装置应完好无损; 2、控制入口烟气温度,保证锅炉水位在正常范围内。 3、严格按照锅炉操作规程作业,中控室密切监控设备运行工况。 4、应对各种操作仪表随时监控,并加强巡检。 存在隐患情况 无 风 险 点 基 本 情 况 应急处置 主要措施 见《锅炉爆炸专项应急预案》 属地监管政府 沂南县人民政府 主管部门 沂南县经信局 专业监管部门 沂南县安监局、质检局
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:18.7 KB 时间:2025-12-06 价格:¥2.00
ICS 点击此处添加 ICS 号 点击此处添加中国标准文献分类号 DB 山东省地方标准 DB XX/ XXXXX—XXXX 建筑陶瓷生产企业职业病隐患排查治理体 系实施指南 Implementary guide for screening and elimination of occupational disease hidden risk of building ceramics enterprise XXXX - XX - XX 发布 XXXX - XX - XX 发 布 DBXX/ XXXXX—XXXX I 目 次 前言..................................................................................II 1 范围................................................................................1 2 规范性引用文件......................................................................1 3 术语和定义..........................................................................1 4 职责要求............................................................................1 5 职业病隐患分类和分级................................................................2 6 工作程序和内容......................................................................3 7 文件管理和持续改进..................................................................4 附录 A(资料性附录) 现场管理类隐患排查治理清单 .......................................6 附录 B(资料性附录) 现场管理类隐患排查治理台账 ......................................20 附录 C(资料性附录) 基础管理类隐患排查治理清单 ......................................22 附录 D(资料性附录) 基础管理类隐患排查治理台账 ......................................27
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:638 KB 时间:2025-12-11 价格:¥2.00
ICS 点击此处添加 ICS 号 点击此处添加中国标准文献分类号 DB 山东省地方标准 DB XX/ XXXXX—XXXX 耐火材料生产企业职业病隐患排查治理体 系实施指南 Implementary guide for screening and elimination of occupational disease hidden risk of refractory material enterprise (送审稿) XXXX - XX - XX 发布 XXXX - XX - XX 实施 发 布 DBXX/ XXXXX—XXXX I 目 次 前言..................................................................................II 1 范围................................................................................1 2 规范性引用文件......................................................................1 3 术语和定义..........................................................................1 4 职责要求............................................................................1 5 职业病隐患分类和分级................................................................2 6 工作程序和内容......................................................................3 7 文件管理和持续改进..................................................................4 附录 A(资料性附录) 现场管理类隐患排查治理清单 .......................................5 附录 B(资料性附录) 现场管理类隐患排查治理台账 ......................................18 附录 C(资料性附录) 基础管理类隐患排查治理清单 ......................................19 附录 D(资料性附录) 基础管理类隐患排查治理台账 ......................................24
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:694 KB 时间:2025-12-24 价格:¥2.00
生产经营单位安全生产风险点登记表 风险点编号:YNZL-CW-02 填报时间:2016 年 8 月 20 日 风险点名称 资产财务部职能岗位员工办公室 风险点 详细位置 资产财务部职能岗位员工办公室 诱发事故类型 火灾、其他伤害 伤亡/财产 损失预测 致残 风险等级 四级 责任人 自建 风险管控 责任部门 行政人事部 手机号码 18669901776 采取管控 措施情况 1、上下楼梯时集中注意力,注意脚下,不在楼梯上驻足,不接打电话。楼梯上禁 止堆放物品;遵守员工制度,上下楼梯时不追打、嬉闹; 2、将水杯放到位时再开热水开关,注意力要集中;尽可能使用隔热效果好的杯子; 3、经常检查线路、电源插座,不用湿手接触电气设施。 存在隐患情况 无 风 险 点 基 本 情 况 应急处置 主要措施 见《火灾现场处置方案》 属地监管政府 沂南县人民政府 主管部门 经信局 专业监管部门 发改、国土、公安、质监、工商、安监、环保
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:19.4 KB 时间:2025-12-24 价格:¥2.00
冶金企业风险点分级管控清单 (炼铁厂烧结区域) 一、原料场...............................................................................................................................................................................................................................................................................2 (一)、堆取料作业.................................................................................................................................................................................................................................................2 (二)、翻车机作业.................................................................................................................................................................................................................................................3 (三)、料场管理.....................................................................................................................................................................................................................................................3 (四)、皮带机作业.................................................................................................................................................................................................................................................3 (五)、汽车料槽作业.............................................................................................................................................................................................................................................3 (六)、上料作业.....................................................................................................................................................................................................................................................4 (七)、设备维护作业.............................................................................................................................................................................................................................................4 (八)、卸料作业.....................................................................................................................................................................................................................................................4 (九)、洗轮机作业.................................................................................................................................................................................................................................................5 二、烧结...................................................................................................................................................................................................................................................................................5 (一)、料槽作业.....................................................................................................................................................................................................................................................5 (二)、混料圆筒作业.............................................................................................................................................................................................................................................6 (三)、烧结机布料作业.........................................................................................................................................................................................................................................6 (四)、单辊、齿辊作业、液压站作业.................................................................................................................................................................................................................7 (五)、带(环)、冷机作业...................................................................................................................................................................................................................................7 (六)、锅炉作业.....................................................................................................................................................................................................................................................7 (七)、风机作业.....................................................................................................................................................................................................................................................8 (八)、电除尘、布袋除尘放灰作业、汽车放料作业.........................................................................................................................................................................................8 (九)、天车作业(电动葫芦、倒链)作业..............................................................................................................................................................................................................9 (十)、发电作业.....................................................................................................................................................................................................................................................9 (十一)、冷(熔)、筛筛分作业、热矿筛作业.................................................................................................................................................................................................10 (十二)、破碎作业...............................................................................................................................................................................................................................................10 (十三)、手持电动工具.......................................................................................................................................................................................................................................10 (十四)、电动三轮车...........................................................................................................................................................................................................................................10 (十五)、熔剂添加...............................................................................................................................................................................................................................................11 (十六)、混配作业...............................................................................................................................................................................................................................................11 (十七)、气力输送作业.......................................................................................................................................................................................................................................11 (十八)、主控室作业...........................................................................................................................................................................................................................................11 (十九)、设备点检、维护作业...........................................................................................................................................................................................................................12 (二十)、电气作业(电气设备、电气室、电缆隧道、燃气(油)、管道和钢制储罐).............................................................................................................................13 (二十一)、危险作业...........................................................................................................................................................................................................................................13 三、检修作业.........................................................................................................................................................................................................................................................................13
分类:风险评估 行业:建筑加工行业 文件类型:Word 文件大小:85.9 KB 时间:2025-12-24 价格:¥2.00
附录二:基础管理类隐患排查清单 专业性检查 综合性检查 序号 排查项目 排查内容与排查标准 排查周期 组织级别 排查周期 组织级别 1、公司应设专门安全管理机构; 1 安全管理机构及人员 2、公司应配备专职安全管理人员。 每年 公司 1、公司、分厂、车间每月召开一次安全生产例会; 2 安全例会制度 2、安全生产例会要有会议纪要、参会人员签到表并做好存档。 每月 分厂 每月 公司 1、公司建立消防安全管理机构; 每年 公司 2、建立消防设施档案台账; 3、建立消防系统图; 4、重要防火部位配置相应的消防设施; 3 消防安全管理制度 5、定期对消防设施进行安全检查,形成闭环管理,并存档。 季度 分厂 半年 公司 1、对于因季节性所引发的安全隐患,应有针对性的专项检查,对于检查的隐患以书面形式下发各责任单位; 4 安全检查制度与隐患排查制度 2、检查的隐患应形成闭环,并做好存档。 每月 分厂 每月 公司 1、应建立健全职业病危害管理台账; 2、应定期发放防止职业病危害的劳保用品,并做好记录; 5 职业病危害防治制度 3、应定期组织职业卫生知识培训。 每年 分厂 每年 公司 1、发生事故后,应严格按照汇报程序进行汇报,不得出现迟报、瞒报的情况; 6 事故管理制度 2、事故发生后,应成立事故调查组。 每年 分厂 每年 公司 1、建立健全重要危险源领导小组; 2、建立重要危险源清单、重要危险源辨识与风险评价表、重要危险源登记表,并存档,定期更新; 3、建立重要危险源分布图,并执行上墙管理; 4、定期对重要危险源进行事故演练,并存档; 每年 分厂 每年 公司 7 重大危险源监控制度 5、定期对重要危险源进行安全检查,形成闭环管理,并存档。 季度 分厂 半年 公司 1、危险品储存是否满足双锁管理要求; 2、危险品使用是否严格按照领用要求执行; 8 危险品管理制度 3、危险品处理是否严格执行资质审核制度。 每年 分厂 每年 公司 1、重要作业制定作业计划书,执行逐级审批程序; 9 许可作业审批制度 2、重要操作执行逐项确认程序。 季度 分厂 季度 公司 1、建立特种作业人员人员管理台账; 10 特殊工种管理制度 2、特种作业人员应具备相应的资质证书,并在有效期内。 每年 分厂 每年 公司 1、制订有限空间作业管理规定; 2、制订受限空间作业管理标准; 每年 分厂 每年 公司 3、执行受限空间作业检查确认程序; 11 受限空间作业管理制度 4、定期对受限空间作业安全检查,形成闭环管理,并存档。 季度 分厂 季度 公司 1、公司要建立健全各类安全技术规程、操作规程; 12 规程 2、如采用新工艺、新技术、新设备、新材料时,应及时更新相关安全技术规程、操作规程,并对有关人员进行专门培训。 每年 公司 专业性检查 综合性检查 序号 排查项目 排查内容与排查标准 排查周期 组织级别 排查周期 组织级别 13 安全生产记录文件 公司应保存完整以下安全生产记录文件:培训记录、安全生产会议记录、安全检查与隐患整改记录、安全装置校验记录、 应急预案及演练记录、职工三级安全档案、交接班记录。 每月 分厂 每月 公司 1、建立健全安全生产培训管理制度; 2、公司应制定年度安全培训计划; 3、特种作业人员必须经培训持证上岗,建立特种作业人员档案; 4、新进公司的职工上岗前,必须接受三级安全教育,每级培训时间不得少于 7 天,考试合格后,方可上岗作业; 5、所有生产作业人员每年接受安全教育、培训,并进行考试合格; 6、采用新工艺、新技术、新设备、新材料时,应对有关人员进行专门培训; 14 安全教育培训 7、作业人员的安全教育培训情况和考核结果,应记录存档。 每年 公司 1、公司应当根据有关法律、法规和技术标准,结合本单位的危险源状况、危险性分析情况和可能发生的事故特点,制定 相应的应急预案; 2、各级建立应急救援领导小组,人员变更的及时更新; 15 应急救援 3、公司各部门根据本单位的事故预防重点,每月组织一次应急预案演练,演练记录存档。 每年 分厂 每年 公司 1、建立安全生产提取费用使用明细,每月汇总; 2、建立安全活动费用使用明细,每月汇总; 16 安全投入 3、应有安全生产提取费用使用记录,并存档。 每年 分厂 每年 公司 1、外包工程承包单位应具备有效的安全生产许可证和相关的承包资质,应设置安全生产管理机构,并制定完善的规章制 度和操作规程; 每年 公司 2、安全管理人员和特种作业人员应具备相应的资质证书,并在有效期内; 17 外包单位 3、发包单位与外包单位应签订安全生产管理协议,明确各自的安全生产管理职责。 每月 分厂 季度 公司 1、公司应制定劳动保护用品配备标准; 每年 公司 2、按照劳保配备标准定期发放劳保用品; 每月 分厂 18 劳动防护用品 3、应有劳保用品发放清单,并存档。 每年 分厂 每年 公司 1、公司应保存完整以下图纸:各工艺车间工艺流程图纸、防排水系统图。 19 综合技术资料 2、特种设备、设施应有具备相应资质的检测检验机构出具合格的检测检验报告,并在检测检验有效期内,超过检验检测 有效期应重新检测检验。 每年 公司
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:125 KB 时间:2025-12-26 价格:¥2.00
生产经营单位安全生产风险点登记表 风险点编号:YNZL-FD-01 填报时间:2016 年 8 月 20 日 风险点名称 脱硝系统 风险点 详细位置 氨水罐区、氨水输送管道 诱发事故类型 遇明火、静电发生火灾、爆炸 伤亡/财产 损失预测 灾难,数人死亡或造成很大财产损失 风险等级 二级 责任人 冯君武 风险管控 责任部门 生产品质部烧成车 间 手机号码 18669938975 采取管控 措施情况 1、经常性对脱硝系统进行检查,防止泄露。 2、管道、储罐材质防腐。 3、应设置风向标、氨气浓度报警系统、防泄漏装置。 4、应配置紧急喷淋装置、应急药品、防护服、正压式空气呼吸 器等应急物品。 5、电气设备应采用防腐、防爆型。 6、脱硝系统严禁烟火。 7、卸氨过程防静电接地。 8、消防设施齐全有效。 风 险 点 基 本 情 况 存在隐患情况 无 应急处置 主要措施 见《氨水事故专项应急预案》 属地监管政府 沂南县人民政府 主管部门 沂南县经信局 专业监管部门 沂南县安监局
分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:18.7 KB 时间:2026-01-02 价格:¥2.00
序号 名称 工程技术措 施 管理措施 四级 1 开车伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 2 飞摇手伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 3 车辆对人的撞击 车辆伤害 车辆伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 4 处理罗拉皮辊缠 花伤手 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 5 拔穗子,飞钢丝 圈伤手 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 6 情绪异常 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 7 清洁辊弹出伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 三级 司 公 分 8 积花、打火伤人 火灾、触电 火灾、触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 间 车 9 落纱机挂上导轨 掉落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 三级 司 公 分 10 电源线破损伤人 触电 触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 11 吊锭失效粗纱脱 落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 12 落纱机碰撞清洁 器导致清洁器掉 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 13 打水烫伤 灼烫 灼烫 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 14 照明灯、吊扇脱 落 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 15 天窗玻璃坠落 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 16 皮辊、托座等机 件掉落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 17 开关按钮失效、 脱落触电 触电 触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 18 噪音 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 19 棉尘吸入伤害 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 20 夏季温度高 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 21 灭火器、表、标 语牌、报警器脱 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 1 开车伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 2 车辆对人的撞击 车辆伤害 车辆伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 3 处理罗拉皮辊缠 花、处理坏纱伤 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 4 拔穗子,飞钢丝 圈伤手 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 5 情绪异常 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 6 清洁辊弹出伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 7 积花、打火伤人 火灾、触电 火灾、触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 车 间 车 间 总 公 司 车 间 落 纱 作 业 值 车 作 业 名称 风险 点等 级 责 任 单位 风险点 排查内容与排查标准 类 型 作业步骤(检查项 目) 危险源或 潜在事件/ 标准 管控措施 三级 8 电源线破损伤人 触电 触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 9 吊锭失效粗纱脱 落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 10 打水烫伤 灼烫 灼烫 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 11 照明灯、吊扇脱 落 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 12 天窗玻璃坠落 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 13 皮辊、托座等机 件掉落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 14 开关按钮失效、 脱落触电 触电 触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 15 噪音 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 16 棉尘吸入伤害 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 17 夏季温度高 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 18 灭火器、表、标 语牌、报警器脱 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 1 门口、通道拐弯 处撞人 车辆伤害 车辆伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 2 情绪异常 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 三级 司 公 分 3 积花、打火伤人 火灾、触电 火灾、触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 4 吊锭失效粗纱脱 落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 5 打水烫伤 灼烫 灼烫 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 6 天窗玻璃坠落 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 7 纱、管掉落砸脚 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 8 皮辊、托座等机 件掉落伤人 机械伤害 机械伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 9 开关按钮失效、 脱落触电 触电 触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 10 噪音 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 二级 11 棉尘吸入伤害 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 12 飞花 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 13 照明灯脱落、照 明光线暗 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 14 夏季温度高 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 15 灭火器、表、标 语牌、报警器脱 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 16 地面积水 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 1 门口、通道拐弯 处撞人 车辆伤害 车辆伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 2 情绪异常 其他伤害 其他伤害 班组、车间两级加强日常检 查,严格按规定落实考核;定 三级 司 公 分 3 积花、打火伤人 火灾、触电 火灾、触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 五级 4 打水烫伤 灼烫 灼烫 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 5 天窗玻璃坠落 高空坠落 高空坠落 班组、车间两级加强日常检 查,严格按规定落实考核;定 四级 6 开关按钮失效、 脱落触电 触电 触电 班组、车间两级加强日常检 查,严格按规定落实考核;定 总 公 司 车 间 车 间 总 公 司 车 间 车 间 车 间 设备 与作 业混 合类 值 车 作 业 挂 纱 作 业 摆 管 作 业
分类:安全管理制度 行业:其它行业 文件类型:Excel 文件大小:74.3 KB 时间:2026-01-02 价格:¥2.00
ICS 点击此处添加 ICS 号 点击此处添加中国标准文献分类号 DB37 山东省地方标准 DB 37/ XXXXX—XXXX 冶金行业企业安全生产风险分级管控体系 实施指南 Implementation Guidelines for the Management and Control System of Risk Classification for Production Safety of XX 文稿版次选择 XXXX-XX-XX 发布 XXXX-XX-XX 实施 山东省质量技术监督局 发 布 DB37/ XXXXX—XXXX I 目 次 前 言.............................................................................III 引 言..............................................................................IV 1 范围.................................................................................1 2 规范性引用文件.......................................................................1 3 术语和定义...........................................................................1 4 准备工作.............................................................................1 5 工作程序和内容.......................................................................2 5.1 风险点确定.......................................................................2 5.2 危险源辨识.......................................................................2 5.3 风险评价.........................................................................3 5.4 风险控制措施的选择和实施.........................................................4 5.5 风险分级管控.....................................................................4 6 文件管理.............................................................................5 7 分级管控的效果.......................................................................5 8 持续改进.............................................................................5 附 录 风险评价方法.................................................................12
分类:风险评估 行业:建筑加工行业 文件类型:Word 文件大小:77 KB 时间:2026-01-11 价格:¥2.00
第 1 页 共 9 页 高速公路施工安全保证措施 一、 施工安全设施的布设 (1) 施工区标志:用于路面工程施工施工过程中占用车道、封闭道 路、借道行驶等。施工区标志根据规范及实际需要,按组进行设置, 重复使用。 施工现场标志支撑采用支架结构形式;标志板采用 1mm 厚镀锌 钢板,采用材料为二级反光膜;字高 30cm。标志尺寸应符合国标要求, 并用沙袋等重物压稳。 (2)临时交通标线: 单侧双向两车道行驶时,需设置中央隔离设施,同时设置临时标 线,包括车道边缘线、车道分界线,用以渠化通向交通、分离对象交通; 标线采用溶剂型反光标线。 (3)临时隔离设施:包括临时隔离栅、隔离墩、水马、锥形路标、防 撞桶等。 锥形路标、防撞桶配合施工标志使用,或作为简易隔离设施单独 使用。 各类标志,均应符合《公路交通安全设施标准》(GB5768-1999) 的规范要求,并具有夜间反光功能。其中隔离墩及钢管须有红白相间 的反光标记;防撞标志桶内要适当填充,防止倒伏;锥形交通标采用 内部填充或压沙袋圈等方法防止倒伏,严禁用砖头、石块等有棱角物 体压制,以免引发交通事故;警示标志牌除支架底部采用铸铁支座外, 可视情况采取压沙袋等方法防止倒伏。施工现场的标志要有专人负责, 第 2 页 共 9 页 必要时采用信号或旗手管制指挥交通,严禁因施工标志摆放不规范而 引发交通事故。 当两公里路段内安排两处或以上施工现场时,可按一处施工现场 布设标志,中间采用锥型交通标连接。 (4)作业控制区内设置交通标志的位置应符合下列规定: (a)作业区在右侧车道时,应将交通标志设在公路右侧路肩上和作业 区边界的左侧; (b)作业区在左侧车道时,除施工预告标志设在右侧硬路肩上外,其 他交通标志应设在施工区边界的右侧或中央分隔带上。 (c)禁令标志:禁止通行标志设在上游过度区的前方;禁止超车标志 设在禁止超车路段的起点处,解除禁止超车标志设在禁止超车路 段的终点处,限制速度标志,设在限制车速路段的起点,标志牌 上标明所限制的速度;解除限制速度标志设在限制车速路段的终 点处。 (d)警告标志:前方施工标志设在警示区的起点处;前方车道变窄标 志应设在车道变窄处前方至少 200 米处;双向通向标志应设在双 向通行路段前至少 400 米处。 (e)指示标志:前方绕行标志设在需要绕行的车辆进出处前至少 200 米处起点处;直行和单向行驶标志,应设在需要直行、转弯和单 向行驶路段前方 200 米处。 (f) 渠化装置:渠化用的锥行路标应从上方过渡区开始,顺车流方向 布置,间距 5-20 米,作业完成后,必须逆着车流方向拆除;交
分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:43.5 KB 时间:2026-01-13 价格:¥2.00
1 xx 花 园 1#、2#、16#楼 文 明 施 工 方 案 2 xx 建 筑 工 程 有 限 公 司 一、工程概况: 建筑概况:本工程由 1#、2#、16#楼 3 个子单位工程组成,其中 2#楼总建筑面积为 3842.2 平方 米,1#及 16#楼总建筑面积为 6889.1 平方米。2#为地上六层,建筑高度为 19.5 米。2#、16#楼为地 上六层,建筑高度为 21.3 米。其中 2#楼一层为杂物间,层高为 2.15 米,二~六层均为套房,层高 2.75 米;2#楼、16#楼底层为店面,层高 4.9 米,一至六层为套房,层高 2.75 米。 二、施工现场安全管理组织措施: 为贯彻“安全地一,预防为主”方针,保护国家,企业的财产免遭损失,保障员工的生命安全 和身体健康,保障施工的顺利进行。本工程实行项目经理责任制,各项目经理为各项目部施工现场 安全管理第一责任人,专职安全员在生产过程中进行工序各工序的安全管理工作,技术负责人必须 贯彻落实安全措施全面管理责任。施工员负责各栋号生产过程中的安全管理工作。其他施工管理人 员及各班组长都应负责自己工作内的安全生产工作管理。 本工程安全管理组织措施采用三级负责制,公司负责对工地安全工作进行监督、指导、由安全科科 长负责具体监督。各项目经理部负责安全工作的具体管理实施任务,各工序的安全材料、防护用品、 用具,同一由各项目部负责协调落实。 三、文明施工技术措施: 1、现场四周用砖砌围墙高 2m,且施工现场子进出口设置,钢大门,配备门卫并制定门卫制度, 进入工地人员均配戴工作卡,门口应设置企业标志及安全对联。且应设置工程概况、施工现场总平 图和安全生产、消防保卫、环境保护、文明施工等制度牌。 2、施工现场主要通道应硬化处理,且进出口处应设洗车道,保证现场内道路通畅,设置排水措 施,工地设置烟处,严禁随便吸烟,宣传栏边布置绿化措施。 3、各项目部建筑材料,构件,按总平面图布置进行堆放,像水泥和其他易飞的细部颗粒建筑材 料应密闭堆放并采取覆盖等措施。料堆挂名称、品种、规格等标牌,材料堆放整齐,施工过程中做 到工完场地清,施工垃圾、生活垃圾应分类指定堆放,并及时清运出场。 4、施工现场按标牌布置图,布置标牌,标牌挂设位置正确,内容齐全。书写安全标语,设置宣 传栏,读报栏,定期出黑板报。 5、施工现场土方作业应采取防止扬尘措施,对从事土方、渣土和施工垃圾运输应采取覆盖措施; 施工现场机械设备、车辆的尾气应符合国家环保排放标准要求,且施工现场严禁焚烧各类废弃物,
分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:35.5 KB 时间:2026-01-18 价格:¥2.00
1 工程项目安全承包协议书 甲方:建设单位 无锡华润华晶微电子有限公司 甲方负责人: 乙方:承包单位 乙方负责人: 为使外单位来我公司施工时采取有效的安全措施,杜绝发生事故,确保施 工现场安全,经双方协商, 乙方保证做到: 1 负责认真贯彻国务院颁布的劳动保护三大法规和上级颁布的有关安全 生产、劳动保护规章制度、文件,并组织学习。 2 负责向甲方通报施工作业人员及机械设备安全技术状况。 3 负责加强安全教育,不断提高乙方成员及作业人员的安全意识和安全操 作水平。 4 负责严格执行无锡华润微电子有限公司《工程项目安全管理制度》、 《动火作业管理制度》、《临时用电管理和电线电缆管理制度》、《安全生产、 防火安全管理制度》和派工制度;电工、电焊工、起重吊装、机动车辆驾驶、 登高架设、切割、冲压、压力容器、锅炉、制冷等特种作业人员必须持证上岗, 持证率必须达到100%。 5 施工单位应明确应急救援组织,指定兼职的应急救援人员,配备必要的 防火、防爆等安全应急器材和设备。 6 负责使用的电气设备、特种设备、压力容器等必须符合《电气安全规 程》、《压力容器安全监察规程》、《起重机械安全管理规定》及上级部门有 关规定,保证设备、容器的安全技术性能的完好、可靠。 7 负责贯彻执行甲方安全环保的有关特殊规定要求,并向甲方负责。进入 2 公司严禁吸烟。 8 负责在高温、大风、阴雨等不良气候条件下工作时,采取防风、防雨、 防滑等安全措施,保证施工安全。 9 负责施工人员和其他人员的个人防护用品、用具及作业场所的各种安全 设施等。乙方在公司内造成的伤亡火灾等事故,一切费用处理均由乙方单位负 责。乙方要及时向甲方通报施工作业伤亡等事故情况,并按照有关规定及时上 报。 10 施工单位使用的涉及生命安全、危险性较大的设备、设施,必须按照 国家有关规定,由专业生产单位生产,并经取得专业资质的检测、检验机构检测、 检验合格,取得安全使用证或者安全标志,方可投入使用。 11 乙方全面负责子项目转包的安全环保责任。负责对转包单位施工人员 的安全环保教育和安全环保管理,并接收甲方安全管理部门对子项目施工的安 全检查。 12 乙方进入公司生产现场区域施工时,必须接受生产现场单位安排的安 全环保教育和遵守生产现场单位的有关安全环保管理制度,严禁野蛮施工。 13 乙方如有人员变动或新进施工人员,应及时通知甲方接收安全教育。 14 甲方安全管理部门有权对施工作业现场进行安全检查督促,有权对出 现的不安全因素提出整改或停工整改。 15 甲方安全管理部门有权废除严重违反安全操作规范或安全工作制度的 承包作业合同。
分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:79.5 KB 时间:2026-01-20 价格:¥2.00
道路分部(分项)施工安全技术交底内容 (一)道路路基挖方施工安全技术要求: 1. 挖方施工区域必须设置专人进行交通管理,对人员、车辆、 机械实行统一指挥。 2. 人工挖土,前后应保持 1.5 米以上距离,左右应保持 1 米以上 距离;机动车辆和装载机配合挖土时,必须距离人工挖土面保持 5 米凡例上的距离。 3. 人机配合挖方施工,人员不准站在机械前进的工作面上,一 定要站在机械工作面以外。 4. 挖土机挖土时,人员不允许在机械回转半径内通过。并保证 一定的施工场地,施工范围内不准安排其它作业。 5. 运土汽车进入场地必须有专人指挥,以保证安全。 6. 压路机碾压时需要人工清理轮上粘土时,清土人员必须站在 村路机的后面清理。 7. 在挖填交接处或悬崖边缘进行挖土施工,必须保留 1 米以上 的安全距离。 8. 挖土时,必须自下而上分层开挖,压层厚度一般不得超过 1 米, 最厚不得超过 1.5 米。严禁掏底放崖而造成坍塌事故。 9. 两侧堆土时,堆土区必须留出人行通道;尽量避免靠墙堆土, 必须堆土时高度不得超过 1 米,并应设良好的排水沟管。 10.工休时,机械、人员不允许靠墙休息,以防发生坍塌伤人事故。 (二)道路路基填方施工安全技术要求: 1. 用斧头、镐头清理树根、杂草时,斧头、镐头前不允许站人。 2. 处理墓穴、枯井底部时,首先要排除周围的险情,采取必要 的安全措施,然后分层填筑。 3. 填方施工时,每侧均应宽于该层填筑坡角 50 厘米,以保证压 路机碾压时足够的安全距离。 4. 机械填土方时,应设立明显的分层和路边桩的标志,防止机 械施工时闪空。 5. 人工配合机械控制分层摊铺时,人工找平必须和机械保持一 定的安全距离。 6. 施工现场必须设立专人指挥,保证人工和机械安全施工。 7. 用电夯夯实时,接夯软线必须绝缘良好,启动、制动开关必 须灵敏安全,工作中不允许夯在电线上,防止发生发生确电事故。 8. 机械压实时,施工人员应站在压实作业面以外;碾压施工要 修整和检查作业面时,机械应停止工作。 (三)道路基层施工安全技术要求: 1. 化石灰、筛石灰时均应站在上风头,工人应穿工作服,戴上 口罩、手套、护目镜、防护帽和鞋盖等,防止石灰腐蚀皮肤。 2. 在居民区周围筛石灰前应用芦席或蓬布将区域进行围档隔 离。 3. 装运土石灰粉时,装车要轻、稳、防止飞扬;运送路上必须 盖上蓬布或塑料布,防止污染环境。 4. 机械拌和灰土时,现场必须有专人指挥,防止发生人员伤亡 事故。 5. 现场运料不能装载过满,以防沿路抛洒伤人。 6. 摊铺整平时,施工人员必须穿高腰鞋袜,防止石灰烧伤皮肤。
分类:安全管理制度 行业:物流仓储行业 文件类型:Word 文件大小:30 KB 时间:2026-01-21 价格:¥2.00
综合性排查 班组巡查车间巡查 工厂巡查 工厂级 序 号 名称 工程技术措施 无 管理措施 1.吊卷人员及叉车人员互相避 让,互相确认,一方停止后方可 继续 2.固化行车运行程序,只能在预 定路线运行。 √ √ √ √ 培训教育措施 提前确认周围环境 √ √ √ √ 个体防护措施 反光背心、安全帽 √ √ √ √ 应急处置措施 急停按钮 √ √ √ √ 工程技术措施 有(雷达报警) √ √ √ √ 管理措施 1.行车运行时,小车下方禁止有 人 2.与被吊物体保持4M以上安全距 离 3.固化行车运行程序,只能在预 定路线运行 √ √ √ √ 培训教育措施 注意观察避让 √ √ √ √ 个体防护措施 反光背心 安全帽 √ √ √ √ 应急处置措施 急停按钮 √ √ √ √ 工程技术措施 有(滑块锁定) √ √ √ √ 管理措施 1.进入压机,安全锁定; 2.佩戴安全帽和防割手套 √ √ √ √ 培训教育措施 进入压机进行安全锁定 √ √ √ √ 个体防护措施 安全锁 /安全帽/防割手套 √ √ √ √ 应急处置措施 急停按钮 √ √ √ √ 工程技术措施 有(红绿灯警示) √ √ √ √ 开 卷 线- 行 车 操 作 四级 作 业 活 动 1 2 作 业 活 动 开 卷 线- 压 机 操 作 四级 冲压车间>开卷线 作 业 活 动 开 卷 线- 叉 车 操 四级 3 冲压车间>开卷线 1次/月 1次/季度 行车操 作 1 2 行车操 作 行车上物体/ 吊物掉落, 行车未按路 线运行 设备动作 压机操 作 1 1次/年 与叉车交叉 作业/行车上 物体/吊物掉 落,行车未 按路线运行 冲压车间>开卷线 冲压车间>开卷线 1 叉车操 作 碰到行人或 行车吊运物 现场类隐患排查清单 风险点 排查内容与排查标准 编号 类型 名称 风险 点等 级 责任单位 作业步骤检 查名称 危险源或潜 在事件(人 、物、作业 环境、管 理) 管控措施 1次/班 日常排查 管理措施 1、叉车转弯时减速、鸣笛、打转 向灯; 2、在转弯处贴警示标语,提醒行 人注意叉车 3.车辆经过路口时通过凸面镜观 察周围环境 4.在临近出口处增加报警装置 5.在地面上增加“慢”标识。遇 到交叉作业情况,叉车让行车先 行 √ √ √ √ 培训教育措施 车间内行走规范 √ √ √ √ 个体防护措施 安全帽 √ √ √ √ 应急处置措施 报警灯/急停按钮 √ √ √ √ 工程技术措施 有(雷达警示) √ √ √ √ 管理措施 拆装4根钢丝绳时手指确认,拆完 后将4根钢丝绳放到模具侧面中心 处,并用卡扣捆扎在一起 √ √ √ √ 培训教育措施 吊模时手指确认,卡扣捆扎 √ √ √ √ 个体防护措施 安全帽 √ √ √ √ 应急处置措施 急停按钮 √ √ √ √ 工程技术措施 无 管理措施 翻转零件时两人进行交流,并注 意周边环境 √ √ √ √ 培训教育措施 人员相互交流 √ √ √ √ 个体防护措施 防割手套 √ √ √ √ 应急处置措施 急停按钮 √ √ √ √ 工程技术措施 无 管理措施 1.线末搬运零件注意周围环境, 避免磕碰 2.零件搬 运时,注意行人 √ √ √ √ 培训教育措施 注意观察周围人员环境 √ √ √ √ 个体防护措施 防割手套 √ √ √ √ 应急处置措施 急停按钮 √ √ √ √ 工程技术措施 有(雷达警示) √ √ √ √ 管理措施 拆装4根钢丝绳时手指确认,拆完 后将4根钢丝绳放到模具侧面中心 处,并用卡扣捆扎在一起 √ √ √ √ 培训教育措施 吊模时手指确认,卡扣捆扎 √ √ √ √ 6 作 业 活 动 模 具 维 修- 行 车 操 三级 冲压车间>模具维修 三级 1 两人同时检 查零件翻转 零件容易割 伤旁边人员 2 线末空间狭 小,零件搬 运易割伤 冲压车间>压机线 三级 1 行车操 作 行车上物体 掉落,模具 被钢丝绳拉 偏 线末收 料 线末收 料 压 机 线- 线 末 收 料 作 业 活 动 5 1 行车操 作 行车上物体/ 吊物掉落, 模具被钢丝 绳拉偏 作 业 活 动 开 卷 线- 叉 车 操 作 四级 3 4 作 业 活 动 压 机 线- 行 车 操 作 冲压车间>开卷线 1 叉车操 作 碰到行人或 行车吊运物 冲压车间>压机线
分类:安全管理制度 行业:其它行业 文件类型:Excel 文件大小:73 KB 时间:2026-01-28 价格:¥2.00
第 1 页 共 9 页 高速公路施工安全保证措施 一、 施工安全设施的布设 (1) 施工区标志:用于路面工程施工施工过程中占用车道、封闭道 路、借道行驶等。施工区标志根据规范及实际需要,按组进行设置, 重复使用。 施工现场标志支撑采用支架结构形式;标志板采用 1mm 厚镀锌 钢板,采用材料为二级反光膜;字高 30cm。标志尺寸应符合国标要求, 并用沙袋等重物压稳。 (2)临时交通标线: 单侧双向两车道行驶时,需设置中央隔离设施,同时设置临时标 线,包括车道边缘线、车道分界线,用以渠化通向交通、分离对象交通; 标线采用溶剂型反光标线。 (3)临时隔离设施:包括临时隔离栅、隔离墩、水马、锥形路标、防 撞桶等。 锥形路标、防撞桶配合施工标志使用,或作为简易隔离设施单独 使用。 各类标志,均应符合《公路交通安全设施标准》(GB5768-1999) 的规范要求,并具有夜间反光功能。其中隔离墩及钢管须有红白相间 的反光标记;防撞标志桶内要适当填充,防止倒伏;锥形交通标采用 内部填充或压沙袋圈等方法防止倒伏,严禁用砖头、石块等有棱角物 体压制,以免引发交通事故;警示标志牌除支架底部采用铸铁支座外, 可视情况采取压沙袋等方法防止倒伏。施工现场的标志要有专人负责, 第 2 页 共 9 页 必要时采用信号或旗手管制指挥交通,严禁因施工标志摆放不规范而 引发交通事故。 当两公里路段内安排两处或以上施工现场时,可按一处施工现场 布设标志,中间采用锥型交通标连接。 (4)作业控制区内设置交通标志的位置应符合下列规定: (a)作业区在右侧车道时,应将交通标志设在公路右侧路肩上和作业 区边界的左侧; (b)作业区在左侧车道时,除施工预告标志设在右侧硬路肩上外,其 他交通标志应设在施工区边界的右侧或中央分隔带上。 (c)禁令标志:禁止通行标志设在上游过度区的前方;禁止超车标志 设在禁止超车路段的起点处,解除禁止超车标志设在禁止超车路 段的终点处,限制速度标志,设在限制车速路段的起点,标志牌 上标明所限制的速度;解除限制速度标志设在限制车速路段的终 点处。 (d)警告标志:前方施工标志设在警示区的起点处;前方车道变窄标 志应设在车道变窄处前方至少 200 米处;双向通向标志应设在双 向通行路段前至少 400 米处。 (e)指示标志:前方绕行标志设在需要绕行的车辆进出处前至少 200 米处起点处;直行和单向行驶标志,应设在需要直行、转弯和单 向行驶路段前方 200 米处。 (f) 渠化装置:渠化用的锥行路标应从上方过渡区开始,顺车流方向 布置,间距 5-20 米,作业完成后,必须逆着车流方向拆除;交
分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:43.5 KB 时间:2026-02-24 价格:¥2.00
道路分部(分项)施工安全技术交底内容 (一)道路路基挖方施工安全技术要求: 1. 挖方施工区域必须设置专人进行交通管理,对人员、车辆、 机械实行统一指挥。 2. 人工挖土,前后应保持 1.5 米以上距离,左右应保持 1 米以上 距离;机动车辆和装载机配合挖土时,必须距离人工挖土面保持 5 米凡例上的距离。 3. 人机配合挖方施工,人员不准站在机械前进的工作面上,一 定要站在机械工作面以外。 4. 挖土机挖土时,人员不允许在机械回转半径内通过。并保证 一定的施工场地,施工范围内不准安排其它作业。 5. 运土汽车进入场地必须有专人指挥,以保证安全。 6. 压路机碾压时需要人工清理轮上粘土时,清土人员必须站在 村路机的后面清理。 7. 在挖填交接处或悬崖边缘进行挖土施工,必须保留 1 米以上 的安全距离。 8. 挖土时,必须自下而上分层开挖,压层厚度一般不得超过 1 米, 最厚不得超过 1.5 米。严禁掏底放崖而造成坍塌事故。 9. 两侧堆土时,堆土区必须留出人行通道;尽量避免靠墙堆土, 必须堆土时高度不得超过 1 米,并应设良好的排水沟管。 10.工休时,机械、人员不允许靠墙休息,以防发生坍塌伤人事故。 (二)道路路基填方施工安全技术要求: 1. 用斧头、镐头清理树根、杂草时,斧头、镐头前不允许站人。 2. 处理墓穴、枯井底部时,首先要排除周围的险情,采取必要 的安全措施,然后分层填筑。 3. 填方施工时,每侧均应宽于该层填筑坡角 50 厘米,以保证压 路机碾压时足够的安全距离。 4. 机械填土方时,应设立明显的分层和路边桩的标志,防止机 械施工时闪空。 5. 人工配合机械控制分层摊铺时,人工找平必须和机械保持一 定的安全距离。 6. 施工现场必须设立专人指挥,保证人工和机械安全施工。 7. 用电夯夯实时,接夯软线必须绝缘良好,启动、制动开关必 须灵敏安全,工作中不允许夯在电线上,防止发生发生确电事故。 8. 机械压实时,施工人员应站在压实作业面以外;碾压施工要 修整和检查作业面时,机械应停止工作。 (三)道路基层施工安全技术要求: 1. 化石灰、筛石灰时均应站在上风头,工人应穿工作服,戴上 口罩、手套、护目镜、防护帽和鞋盖等,防止石灰腐蚀皮肤。 2. 在居民区周围筛石灰前应用芦席或蓬布将区域进行围档隔 离。 3. 装运土石灰粉时,装车要轻、稳、防止飞扬;运送路上必须 盖上蓬布或塑料布,防止污染环境。 4. 机械拌和灰土时,现场必须有专人指挥,防止发生人员伤亡 事故。 5. 现场运料不能装载过满,以防沿路抛洒伤人。 6. 摊铺整平时,施工人员必须穿高腰鞋袜,防止石灰烧伤皮肤。
分类:安全管理制度 行业:物流仓储行业 文件类型:Word 文件大小:30 KB 时间:2026-02-25 价格:¥2.00
1 工程项目安全承包协议书 甲方:建设单位 无锡华润华晶微电子有限公司 甲方负责人: 乙方:承包单位 乙方负责人: 为使外单位来我公司施工时采取有效的安全措施,杜绝发生事故,确保施 工现场安全,经双方协商, 乙方保证做到: 1 负责认真贯彻国务院颁布的劳动保护三大法规和上级颁布的有关安全 生产、劳动保护规章制度、文件,并组织学习。 2 负责向甲方通报施工作业人员及机械设备安全技术状况。 3 负责加强安全教育,不断提高乙方成员及作业人员的安全意识和安全操 作水平。 4 负责严格执行无锡华润微电子有限公司《工程项目安全管理制度》、 《动火作业管理制度》、《临时用电管理和电线电缆管理制度》、《安全生产、 防火安全管理制度》和派工制度;电工、电焊工、起重吊装、机动车辆驾驶、 登高架设、切割、冲压、压力容器、锅炉、制冷等特种作业人员必须持证上岗, 持证率必须达到100%。 5 施工单位应明确应急救援组织,指定兼职的应急救援人员,配备必要的 防火、防爆等安全应急器材和设备。 6 负责使用的电气设备、特种设备、压力容器等必须符合《电气安全规 程》、《压力容器安全监察规程》、《起重机械安全管理规定》及上级部门有 关规定,保证设备、容器的安全技术性能的完好、可靠。 7 负责贯彻执行甲方安全环保的有关特殊规定要求,并向甲方负责。进入 2 公司严禁吸烟。 8 负责在高温、大风、阴雨等不良气候条件下工作时,采取防风、防雨、 防滑等安全措施,保证施工安全。 9 负责施工人员和其他人员的个人防护用品、用具及作业场所的各种安全 设施等。乙方在公司内造成的伤亡火灾等事故,一切费用处理均由乙方单位负 责。乙方要及时向甲方通报施工作业伤亡等事故情况,并按照有关规定及时上 报。 10 施工单位使用的涉及生命安全、危险性较大的设备、设施,必须按照 国家有关规定,由专业生产单位生产,并经取得专业资质的检测、检验机构检测、 检验合格,取得安全使用证或者安全标志,方可投入使用。 11 乙方全面负责子项目转包的安全环保责任。负责对转包单位施工人员 的安全环保教育和安全环保管理,并接收甲方安全管理部门对子项目施工的安 全检查。 12 乙方进入公司生产现场区域施工时,必须接受生产现场单位安排的安 全环保教育和遵守生产现场单位的有关安全环保管理制度,严禁野蛮施工。 13 乙方如有人员变动或新进施工人员,应及时通知甲方接收安全教育。 14 甲方安全管理部门有权对施工作业现场进行安全检查督促,有权对出 现的不安全因素提出整改或停工整改。 15 甲方安全管理部门有权废除严重违反安全操作规范或安全工作制度的 承包作业合同。
分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:79.5 KB 时间:2026-02-28 价格:¥2.00
提供施工设备服务 2026 年应急演 练方案 (行业代码:5030) 编制单位:企安文库(安全生产文档模板专业服务平台) 编制日期:2026 年 3 月 官方网站:www.qiandoc.com 第一章 总则 1.1 编制目的 为切实提高提供施工设备服务行业应对突发事件的能力,规范应急管理工作程序,保障从 业人员生命财产安全,减少事故损失,维护社会稳定,依据国家相关法律法规和标准规范 ,制定本应急演练方案。本方案旨在通过系统化、规范化的应急演练,提升行业整体应急 管理水平。 1.2 编制依据 1. 《中华人民共和国安全生产法》(2021 年修订) 2. 《中华人民共和国突发事件应对法》 3. 《生产安全事故应急条例》(国务院令第 708 号) 4. 《GB/T 29639-2020 生产经营单位生产安全事故应急预案编制导则》 5. 《GB/T 4754-2017 国民经济行业分类》 6. 提供施工设备服务行业相关安全生产标准和规范 7. 《危险化学品安全管理条例》(国务院令第 591 号) 8. 《特种设备安全监察条例》(国务院令第 549 号) 9. 地方性安全生产法规和规章 10. 行业主管部门发布的指导性文件 1.3 适用范围 本方案适用于提供施工设备服务行业所有生产经营单位,包括但不限于: 1. 生产作业场所的应急演练组织和实施 2. 储存设施区域的应急演练组织和实施 3. 运输装卸环节的应急演练组织和实施 4. 办公生活区域的应急演练组织和实施 5. 相关方在本单位区域内的应急演练组织和实施 6. 跨单位、跨区域的联合应急演练组织和实施 1.4 工作原则 1.4.1 生命至上,安全第一 始终把保障人民群众生命安全和身体健康放在首位,最大限度地预防和减少突发事件造成 的人员伤亡和危害。在应急演练中重点突出人员疏散、医疗救护等生命安全保障环节。 1.4.2 预防为主,防救结合 坚持预防与应急相结合,常态与非常态相结合,做好应对突发事件的各项准备工作。通过 演练检验预防措施的有效性,提升应急救援能力。 1.4.3 统一领导,分级负责 建立健全统一指挥、分级负责、反应灵敏、协调有序、运转高效的应急管理机制。明确各 级职责,确保应急指挥体系高效运行。 1.4.4 依法规范,科学处置 依法开展应急管理工作,运用先进技术和方法,提高应急处置的科学性和有效性。遵循行 业标准和规范,确保演练科学规范。 1.4.5 全员参与,注重实效 加强应急宣传教育,提高从业人员应急意识和自救互救能力,确保演练取得实效。注重演 练成果转化,提升整体应急水平。 1.4.6 结合实际,突出重点 结合提供施工设备服务行业特点和风险特征,突出重点环节、重点部位、重点人员的应急 演练,增强针对性和可操作性。
分类:事故与应急 行业:其它行业 文件类型:Word 文件大小:44.2 KB 时间:2026-04-04 价格:¥2.00