大约有12000项符合查询结果,库内数据总量为14329项,搜索耗时:0.0161秒。

【精编资料】-64-加油站应急预案

加油站应急预案 目录 一、总 则∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 二、加油站火灾爆炸应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙8 三、加油站跑冒油品应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙11 四、加油站混油应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙15 五、加油站治安事件应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙17 六、加油站洪汛灾害应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙19 七、加油站成品油供应短缺应急预案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙21 八、加油站外线停电应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙23 九、加油站交通事故应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙25 十、加油站防台风应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙27 十一、加油站卫生健康应急预案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙28 十二、加油站防雷击应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙31 十三、加油站数质量纠纷、媒体曝光、系统外检查应急预 案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙33 十四、加油站地震灾害应急预案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙36 十五、附件∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙38 一、总 则 一、编制目的 为了全面贯彻落实“安全第一、预防为主”的HSE方针,规范加 油站的应急事件管理工作,提高对突发事件的应急救援反应速度, 增强加油站综合处置应急事件的能力,保障企业员工和公众安全, 最大限度减少财产损失、环境破坏和社会影响,特制定本预案。 二、编制依据 中华人民共和国安全生产法 中华人民共和国消防法 中华人民共和国环境保护法 中华人民共和国防洪法 国家突发公共事件总体应急预案 中国石化重特大事件应急预案 中国石油化工股份有限公司内部控制制度(2007版) 中国石油化工股份有限公司湖南石油分公司HSE管理体系实 施程序(2005年1月1日向社会发布实施) 《中国石化湖南石油分公司总体应急预案》(2007年) 三、工作原则 ⒈以人为本、减少危害的原则。最大限度减少人员伤亡和财 产损失,把事故危害降到最低点,维护加油站安全和社会稳定。

分类:事故与应急 行业:其它行业 文件类型:Word 文件大小:202 KB 时间:2025-08-12 价格:¥5.00

班组安全管理资料合集-班组(承包单位)安全生产协议

班组(承包单位)安全生产协议书 一、立协议双方 项 目 部 ( 公 司 ) : (以下简称甲方) 班 组 ( 承 包 单 位 ) : (以下简称乙方) 为了使本工程能快速安全的完成,并确保广大职工的生命财产安全,为 明确双方的职责范围,特立此协议。 二、立协议目标 控制事故的发生,确保安全事故为零,工伤负伤率在 1‰ 三、甲方职责 1、为班组提供必须的安全保障措施、设施,如(安全帽、安全带、 外 脚手架、 临边防栏) 等,但不提供一般的劳保用品,如(工作服、工作 鞋、手套)等。 2、制订各项安全管理制度和措施,为班组创造良好的工作环境。 3、帮助班组开展各项安全教育、 、“三级安全教育”和安全知 识教育,并通过各种宣传手段进行强化(黑板报、录像)等。 4、组织各特殊工种、中小型机械操作工的培训考核工作。 5、监督班组劳动纪律、阻止各类违章作业,并有权对违章人员采取以 下措施。 A、现场教育整改、检讨; B、罚款处理; C、情节严重,清退出场。 四、乙方职责 1、严格执行“三级安全教育”制度,负责对本工种内的安全技术交底 和安全知识教育。 2、严格挑选有技术、高素质的工作人员,严禁招收社会闲散人员和盲 流人员。招收职工必须要求三证齐全(身份证、 务工证、健康证)。 3、与每位职工签订劳务协议,以免以后引起劳务纠纷。 4、遵守劳动纪律,严禁违章指挥和强令他人违章作业。 5、服从项目部的统一指挥。各工程各班组之间要相互协调, 团结一致, 要以项目部和整体利益为重。 6、由于违章指挥和违章作业等造成的工伤事故, ,一切责任将由班 组承担,项目部将不承担一切责任。 7、各中小型机械和特殊工种,必须持有效证件上岗,对无证人员应进 行培训,培训费用由班组承担。 8、做好文明施工所需的各项工作,如“落手清”、 、“材料堆放等。 本协议一式二份,工程开工生效至工程结束。本协议作为与班组承包协 议的补充协议有同等效用。 项目部(公司名称): 班 组(承包单位): 代 表: 代 表: XX项目部(公司) 日 期

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:22.8 KB 时间:2025-10-05 价格:¥5.00

【精编资料】-64-加油站应急预案

加油站应急预案 目录 一、总 则∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 二、加油站火灾爆炸应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙8 三、加油站跑冒油品应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙11 四、加油站混油应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙15 五、加油站治安事件应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙17 六、加油站洪汛灾害应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙19 七、加油站成品油供应短缺应急预案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙21 八、加油站外线停电应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙23 九、加油站交通事故应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙25 十、加油站防台风应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙27 十一、加油站卫生健康应急预案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙28 十二、加油站防雷击应急预案 ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙31 十三、加油站数质量纠纷、媒体曝光、系统外检查应急预 案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙33 十四、加油站地震灾害应急预案∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙36 十五、附件∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙38 一、总 则 一、编制目的 为了全面贯彻落实“安全第一、预防为主”的HSE方针,规范加 油站的应急事件管理工作,提高对突发事件的应急救援反应速度, 增强加油站综合处置应急事件的能力,保障企业员工和公众安全, 最大限度减少财产损失、环境破坏和社会影响,特制定本预案。 二、编制依据 中华人民共和国安全生产法 中华人民共和国消防法 中华人民共和国环境保护法 中华人民共和国防洪法 国家突发公共事件总体应急预案 中国石化重特大事件应急预案 中国石油化工股份有限公司内部控制制度(2007版) 中国石油化工股份有限公司湖南石油分公司HSE管理体系实 施程序(2005年1月1日向社会发布实施) 《中国石化湖南石油分公司总体应急预案》(2007年) 三、工作原则 ⒈以人为本、减少危害的原则。最大限度减少人员伤亡和财 产损失,把事故危害降到最低点,维护加油站安全和社会稳定。

分类:事故与应急 行业:其它行业 文件类型:Word 文件大小:202 KB 时间:2025-10-22 价格:¥5.00

岗位安全责任制资料合集-【汇编】学校安全目标责任书(30页)

学校安全目标责任书 xxxx 中学 2020 年 1 月 序号 内容 分管领导 责任人 页码 1 政教副校长安全目标责任书 陈广为 郑崇鸿 2 教务副校长安全目标责任书 陈广为 贺广静 3 后勤副校长安全目标责任书 陈广为 桑继才 4 法制副校长安全目标责任书 陈广为 高希兵 5 工会主席安全目标责任书 陈广为 曹 阳 6 安办主任安全目标责任书 郑崇鸿 薛守兵 7 德育主任安全目标责任书 郑崇鸿 杨栋 8 教务主任安全目标责任书 贺广静 刘丙伟 9 总务主任安全目标责任书 桑继才 张海深 10 团委书记安全目标责任书 郑崇鸿 金德科 11 教研组长安全目标责任书 贺广静 刘仁龙、杨学辉、田 红霞、杨 栋、韩庆 广、李长慧 12 年级部主任安全目标责任书 郑崇鸿、金德 科、贺广静 李恒友、张立生、李 兆明 13 班主任安全目标责任书 郑崇鸿  班主任(18) 14 任课教师安全目标责任书 贺广静  各任课教师 15 体育教师安全目标责任书 曹阳 李长会、张林、张洁 16 电教教师安全目标责任书 贺广静 杨永伟、孙浩 17 财务人员安全目标责任书 桑继才 张海深 18 财产管理安全目标责任书 桑继才 高长军 19 图书管理安全目标责任书 贺广静 刘庆华 20 体育器材保管员安全目标责任书 曹阳 李长慧 21 实验室管理安全目标责任书 贺广静 沈福红 22 食堂管理安全目标责任书 桑继才 张宗会 23 宿舍管理安全目标责任书 桑继才 徐华、王俊英 24 文印室人员安全目标责任书 桑继才 魏玉辉 25 水电工安全目标责任书 桑继才 姚连成 26 门卫人员安全目标责任书 郑崇鸿 焦德青、陶纪伟、张 庚增

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:104 KB 时间:2025-11-10 价格:¥5.00

安全管理资料-机械制造企业安全生产督导检查表

机械制造企业安全生产督导检查表(现场部分) 序 号 检查内容 检查标准 检查 办法 检查 结果 1 用电安全 1.配电室应有通风、防潮、防火、防尘、防触电、防小 动物设施,并悬挂安全警示标语。 2.用电设备一般应采用一机一开关,一漏电保护器,过 流保护器,一电控箱。 3.使用电气设备为防止人体触电必须正确使用绝缘、屏 护、间距措施。 4.低压接户线应采用绝缘导线。 5.电源开关安装高度距离地面 1.3-1.5m。明装插头一般 在 1.3-1.5m。暗装插座离地面高度取 0.2-0.3m。灯具安装 高度,室内一般为 2.2-3m。室外 3m。墙上灯具安装高度 为 2.5m。不足的要加防护。露天灯具开关采用防雨式, 安装必须牢固可靠。 6.仓库不准使用带起辉器的光管,不准灯具加设在货物 上空,照明灯泡应小于 40 瓦。危险品仓库只许装防爆电 器,严禁使用普通电器,雷管、药库严禁加设电器设施。 7.电器设备的电源线应采用标准的扁三脚插头,不准用 导线直接插入或挂接电源插座或开关。 8.手持电动工具的电气绝缘和机械必须绝缘良好,完整 无破损。 9.临时低压配电线路: (1)安装临时低压配电线路必须经单位的动力、安技部 门批准,临时线使用期为 7 天,最长不得超过 30 天。 (2)装设临时配电线路必须用良好的绝缘导线,架设时 户内不得低于 2.5m,户外不得低于 3.5m,与设备水管、 门窗等的距离在 0.3m 外,与道路交叉处不低于 6m。 (3)临时配电线路必须装有总开关控制,每一分路装分 开关和熔断器。 (4)分路线不得在灯头内并头,须用 T 字接法并用绝缘 查看 现场 序 号 检查内容 检查标准 检查 办法 检查 结果 包布包好。 (5)所用电气设备金属外壳须有良好的接地保护或接零 保护。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:25.4 KB 时间:2025-11-12 价格:¥5.00

安全管理资料-电厂安全生产督导检查表

电厂安全生产督导检查表(现场部分) 序 号 检查内 容 检查标准 检查 办法 检查 结果 1 安全设 施 1.楼板、升降口、吊装孔、地面闸门井、雨水 井、污水井、坑池、沟等处的栏杆、盖板、护 板等设施齐全,符合国家标准及现场安全要求。 因工作需拆除防护设施,必须装设临时遮拦或 围栏,工作终结后,及时恢复防护设施。 2.电气高压试验现场应装设遮拦或围栏,设醒 目安全警示牌。 3.热水井、污水井具有防人员坠落措施。 4.梯台的结构和材质良好,钢直梯护圈和踢脚 板等防护功能齐全,符合国家安全生产要求。 5.机器的转动部分防护罩或其他防护设备(如 栅栏)齐全、完整,露出的轴端设有护盖。 6.电气设备金属外壳接地装置齐全、完好。 7.生产现场紧急疏散通道必须保持畅通。 查看 现场 序 号 检查内 容 检查标准 检查 办法 检查 结果 2 电气安 全 1.配电室与其它建筑物间有足够的安全消防通 道。与爆炸危险场所、有腐蚀性场所有足够的 安全间距。 2.配电室门应向外开,高压室(间)门应向低 压间开,相邻配电室门应双向开。 3.配电室应设置防止雨、雪和蛇、鼠类小动物 从窗、门、电缆沟等进入室内的设施。 4.配电装置室内通道应保证畅通无阻,不得设 置门槛,并不应有与配电装置无关的管道通过。 5.有规定的警示标志及工作标志。 6.配备齐全的消防器材。 7.电缆穿墙或楼板的孔洞用防火材料封堵完 好。 问询 查看 档案 查看 现场 3 防爆安 全 1.现场承压设备及管道系统经过定期检验合 格,安全附件齐全、完好,材质符合安全要求, 承压能力满足系统运行工况。 2.高压气瓶无严重腐蚀或严重损伤,定期检验 合格,并在检验周期内使用。色标、色环清晰, 安全装置良好,存放符合要求,使用符合安全 规定。 3.蓄电池室、油罐室、油处理室等重点场所使 用防爆型照明和通风设备,配备有必要的防爆 工具。 查看 档案 查看 现场

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:24.8 KB 时间:2025-11-13 价格:¥5.00

安全管理资料-建设工程竣工验收消防备案表

建设工程竣工验收消防备案表 备案时间: 年 月 日 建设单位 备 案 人 工程名称 联系电话 工程地址 使用性质 消防设计备案号 竣工验收日期 建设工程质量监督机构 单位类别 单位名称 资质等级 联系人 联系电话 设计单位 施工单位 监理单位 检测单位 建筑物名称 结 构 耐火 等级 高度 层数 建筑面积 火灾危险性类别 设置位置 设置型式 □内浮顶罐 □水槽式罐 □浮顶罐 □球形罐 □拱顶罐 □卧式罐 □其它 储物类别 □可燃液体 □易燃液体 □可燃气体 □助燃气体 □不燃气体 □其它 储存物质 名称 火灾危险性类别 储罐材质 储存温度 储存形式 储 罐 □钢 □砼 □硅 □洞穴 □低温 □常温 □地上 □半地下 □地下 堆场 储量 储存物质名称 □ 土建工程 □防火间距 □防火分区 □防烟分区 □消防电梯 □防烟楼梯 □封闭楼梯 □消防车通道 □消防控制室 □ 室内装修工程 □顶棚 □墙面 □地面 □隔断 □固定家具 □装饰织物 □其他装饰材料 消防设施 设置场所 类型 □室内消火栓系统 □常高压 □临时高压 □干式消防竖管 □消防水箱 □水泵接合器 □自动喷水灭火系统 □干式 □湿式 □预作用 □雨淋 □水幕 □水雾 □火灾自动报警系统 □区域报警 □集中报警 □控制中心报警 □ 气体灭火系统 □管网 □无管网 □洁净气体 □其他 □ 泡沫灭火系统 □固定 □半固定 □移动 □高倍 □中倍 □低倍 □抗溶性 □氟蛋白 □清水 □其他 □ 防烟排烟系统 □机械排烟 □正压送风 □自然排烟 □ 灭火器 □干粉 □气体 □水系 □泡沫 □其他 □ 干粉灭火系统 □全淹没 □局部 工 程 基 本 情 况 □ 其他 竣工验收情况: 说 明 一、在填表前,应当阅读《中华人民共和国消防法》和公 安部《建设工程消防监督管理规定》,并确知享有的权利和应 尽的责任。 二、表格设定的栏目,要逐项填写;不需填写的,要划去。 “备案人”、“联系人”、“联系电话”栏必须填写有效的联系方式。 三、表格中出现多个“□”,表示有多个内容可供选择,在 选中内容前的“□”内打√。 四、“竣工验收情况”应填写该工程使用或者安装消防产品 和有防火性能要求的建筑构件、建筑材料、室内装修装饰材料 的情况,消防施工质量是否符合国家工程建设消防技术标准、 满足消防设计文件要求,竣工验收是否合格等情况。

分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:54.5 KB 时间:2025-11-14 价格:¥5.00

安全管理资料-12电焊工安全操作规程GDAQ340112

电焊工安全操作规程 GDAQ340112 一、电焊工必须经有关部门考核合格,取得特种作业人员操作证书,方可上岗。 二、电焊机外壳,必须接零接地良好,其电源的拆装应由电工进行。现场使用的电焊机应设有可防雨、防潮、 防晒的机棚,并备有消防器材。 三、电焊机要设单独的开关,开关应放在防雨的闸箱内,拉合时应戴手套侧向操作。 四、焊钳与把线必须绝缘良好,连接牢固,更换焊条应戴手套,在潮湿地点工作,应站在绝缘胶板或木板上。 五、严禁在带压力的容器或管道上施焊,焊接带电和设备应切断电源。 六、焊接储存易燃、易爆、有毒物品的容器或管道,应清除干净,将所有的孔口打开。 七、在密闭金属容器内施焊时,容器可靠接地,通风良好,并应有人监护。严禁向容器内输入氧气。 八、焊接预热工件时,应有石棉布或挡板等隔热措施。 九、焊线、地线、禁止与钢丝绳子接触,不得用钢丝绳或机电设备代替零线,所有地线接头,应连接牢固。 十、更换场地移动焊线时,应切断电源,不得用手持焊线爬梯登高。 十一、消除焊渣时,应戴防护眼镜或面罩,防止铁渣飞溅伤人。 十二、多台焊机一起集中施焊时,焊接平台或焊件必须接零接地,并有隔光板。 十三、钍钨机要放置在密闭铅合内,磨削钍钨机时,必须戴手套、口罩,将粉尘及时排除。 十四、二氧化碳气体预热器的外壳应绝缘,端电压不应大于 36V。 十五、雷雨时,应停止露天焊接。 十六、施焊场地周围应清除易燃易爆物品,或进行覆盖、隔离。 十七、必须在易燃易爆气体或液体扩散区施焊时,应经有关部门检查许可后,方可施焊。 十八、工作结束后,应切断焊机电源,并检查操作地点确认无起火危险后,方可离开。 十九、电焊机必须安装二次空载降压保护器或触电保护器,交流弧焊机变压器的一次侧电源线长度应不大 于 5m,进线处必须设置防护罩。

分类:安全操作规程 行业:其它行业 文件类型:Word 文件大小:27.5 KB 时间:2025-11-17 价格:¥5.00

安全管理资料-4钢结构吊装安全技术交底GDAQ330804

钢结构吊装安全技术交底 GDAQ330804 施工单位: 工程名称 分部分项 工  程 工种 一、进入施工现场必须遵守安全操作规程和安全生产纪律,特种作业人员必须持证上岗。 二、进入现场,必须戴好安全帽,扣好帽带,并正确使用个人劳动防护用具。 三、悬空作业处应有牢靠的立足处,并正确佩带和悬挂安全带,必要时设置栏杆或其他安全设施。 四、悬空作业所用的操作平台需经过设计计算,并验收后方可使用。 五、在利用建筑结构作作业平台时,为了便于柱子螺栓等施工的方便,需在立足部位铺设适当数量的脚手板。 六、在钢结构吊装时,为防止人员、物料和工具坠落或飞出造成安全事故,需铺设安全网。安全平网设置 在梁面以下,当楼层高度小于 4.5m 时,安全平网可隔跨设置。安全平网要求在作业范围内满铺;为防止人和物 飞出造成安全事故,须在建筑物外围铺设安全立网。 七、为了便于接柱施工,在接柱处要设操作平台,平台固定在下节柱的顶部。 八、需在刚安装的钢梁上设置存放电焊机、空压机、氧气瓶、乙炔瓶等设备用的平台,放置距离符合安全 生产的有关规定。 九、为便于施工登高,应设置可靠的上下通道。 十、施工用的电动机械和设备均须接地,禁止使用破损的电线和电缆,严防设备漏电。施工用的电动机具 的电缆,宜集中在一起,并随楼层的施工而逐节升高,每层楼面须分别设置配电箱,供每层楼面施工用电需要。 十一、遇有六级以上的大风、雷雨、浓雾等恶劣气候,不得进行起重和高处作业。 十二、施工时还应该注意防火,配置必要的灭火设备和消防监护人员。 十三、严禁高空抛物,严禁随意摆放工具和构配件,应放在安全可靠部位,以免掉下伤害他人。 十四、吊装前,应检查吊钩、钢丝绳等吊具是否符合使用规定。 十五、现场补充交底内容: 交底人签字: 日 期: 接受人(全员)签字: 注:本交底一式三份,班组、交底人、资料保管员各一份。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:36 KB 时间:2025-11-18 价格:¥5.00

安全管理资料-建筑工地消防安全专项检查表

建筑工地消防安全专项检查表 工程名称 建设单位 项目负责人 监理单位 项目总监 施工单位 项目经理 序 号 检查项目 内容与要求 存在问题 1 消防安全 管理制度 1.是否编制施工现场防火技术方案; 2.是否编制施工现场灭火和应急疏散预案; 3.教育培训、技术交底、消防检查及应急疏散演 练落实情况。 2 生活区 防火 1.在建工程内是否设置员工集体宿舍; 2.生活区搭设是否符合要求; 3.临时用房是否违规采用易燃可燃材料为芯材的 彩钢板搭建; 4.生活区内部的存放易燃易爆物品,必须要按规 定配备消防器材; 5.生活区内严禁乱拖乱接简易插座,电线必须套 管敷设; 6.严禁宿舍、仓库内生火煮食,严禁使用电炉、 电热器具等大功率电器。 3 现场防火 1.施工现场必须合理、有效的配置消防设施或合 格的消防器材,且有专人管理; 2.消防器材配置数量或间距必须符合要求; 3.动火作业必须配备监护人员; 4.特种作业人员(动火作业人员)必须持证上岗; 5.动火作业必须落实动火审批制度。 4 施工焊接 防火 1.焊割现场必须配备消防器材; 2.焊割部位与氧气瓶、乙炔瓶、乙炔发生器以及 各种易燃、可燃材料必须有效隔离; 3.乙炔瓶、氧气瓶不得平放卧倒使用,不得直接 曝晒,必须设置防撞击措施; 4.在高空焊接必须采取措施控制火花溅落。 5 电气防火 1.配电线路、配电设备应符合设计及规范要求; 2.灯具应符合要求。 6 日常管理 记录 1.消防检查记录是否齐全; 2.消防安全教育及消防安全技术交底记录是否齐 全。 7 易燃物消 防管理 1.存放易燃液体、气体场所必须采用防爆型电器 设备及照明工具; 2.不得在库房内使用明火; 3.乙炔发生器,乙炔瓶和氧气瓶在新建、维修工 程内存放时,是否设置专用房间单独分开存放、 设专人管理且配备消防器材,设置消防标志。 8 消防通道 及救援设 施 1.建筑物内外道路和通道必须保持通畅,施工现 场应设置临时消防车道; 2.疏散走道、楼梯、坡道应保持通畅,不得堆放 材料、机具等。 建设单位检查人员 年 月 日 监理单位检查人员 年 月 日 施工单位检查人员 年 月 日

分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:35.5 KB 时间:2025-11-20 价格:¥5.00

安全管理资料-油气输送管道企业保护检查表

****企业油气输送管道保护检查表 项目 检查内容 检查 方法 检查依据 处罚 依据 及标 准 1.建立健全油气输送 管道保护责任制 2.制定油气输送管道 保护规章制度 3.建立、健全管道巡 护制度,配备专门人 员对管道线路进行日 常巡护、检测和维修 4.保证油气输送管道 保护投入 5.制定本企业管道事 故应急预案,并报地 方政府主管管道保护 工作的部门备案 一、贯彻落 实油气输送 管道保护主 体责任情况 6.油气输送管道保护 重大问题及隐患整治 《石油天然气管道保护 法》 1.管道项目是否符合 油气发展规划、城乡 规划等 《石油天然气管道保护 法》《国务院安全生产委 员会成员单位安全生产 工作职责分工》 二、油气输 送管道项目 合法合规审 批情况 2.核准及相关要件 查看 资料 现场 检查 《石油天然气管道保护 法》《政府核准投资项目 管理办法》 移 送 执 法 职 责 部 门 或市、 县 政 府 3.对新建管道通过区 域不能满足管道保护 法规定的管道保护要 求的,管道企业是否 提出防护方案,并经 管道保护方面的专家 评审论证,报经管道 所在地县级以上地方 人民政府主管管道保 护工作的部门批准 《石油天然气管道保护 法》 4.油气输送管道项目 建成后应按国家有关 规定进行竣工验收 《石油天然气管道保护 法》 5.管道企业是否自管 道竣工验收合格之日 起六十日内,将竣工 测量图报管道所在地 县级以上地方人民政 府主管管道保护工作 的部门备案 《石油天然气管道保护 法》 1.管道企业是否定期 对管道进行检测、维 修 2.管道企业是否配备 管道保护所必需的人 员和技术装备 三、油气输 送管道运行 中的保护 3.管道企业是否对停 止运行、封存、报废 的油气输送管道采取 必 要 的 安 全 防 护 措 施,并报县级以上地 方人民政府主管管道 保护工作的部门备案 《石油天然气管道保护 法》 四、设备及 研发情况 重大设备研发、先进 技术、成套设备引进 《国务院安全生产委员 会成员单位安全生产工

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:22.8 KB 时间:2025-11-20 价格:¥5.00

安全管理资料-4.电子行业安全操作规程(共52个)

4.电子行业安全操作规程 1、安全生产总则 ....................................................................................................................................3 2、一般仪表工安全操作规程 ...............................................................................................................4 3、仪表装配工安全操作规程 ...............................................................................................................5 4、仪表校验工安全操作规程 ...............................................................................................................5 5、电子元器件筛选工安全操作规程...................................................................................................6 6、中频电源安全操作规程....................................................................................................................6 7、X 射线定向仪安全操作规程............................................................................................................7 8、切片机安全操作规程........................................................................................................................7 9、封帽机安全操作规程........................................................................................................................7 10、浸焊机安全操作规程 .....................................................................................................................8 11、老炼线、老化架安全操作规程.....................................................................................................8 12、剪脚机安全操作规程 .....................................................................................................................8 13、黑胶机安全操作规程 .....................................................................................................................8 14、电动起子安全操作规程 .................................................................................................................9 15、电铬铁安全操作规程 .....................................................................................................................9 16、热风枪与电吹风安全操作规程.....................................................................................................9 17、接插式台式压力机安全操作规程..............................................................................................10 18、耐压测试仪安全操作规程...........................................................................................................10 19、调压器安全操作规程...................................................................................................................10 20、中拉机安全操作规程...................................................................................................................11 21、护套生产线安全操作规程...........................................................................................................11 22、绞对机安全操作规程...................................................................................................................12 23、高精度对绞机安全操作规程 ......................................................................................................12 24、塑料骨架安全操作规程...............................................................................................................13 25、注塑机安全操作规程...................................................................................................................13 26、冷焊机安全操作规程...................................................................................................................14 27、纵包机安全操作规程...................................................................................................................15 28、色环机安全操作规程...................................................................................................................16 29、双扭成缆机安全操作规程...........................................................................................................16 30、串联线安全操作规程...................................................................................................................16 31、成缆机安全操作规程...................................................................................................................17 32、修模工安全操作规程...................................................................................................................17 33、灯泡测试工安全操作规程...........................................................................................................18 34、灯泡涂料工安全操作规程...........................................................................................................18 35、打泡车间工安全操作规程...........................................................................................................18 36、蒸铝车间工安全生产规程...........................................................................................................19 37、酸洗工安全操作规程...................................................................................................................19 38、电镀工安全操作规程...................................................................................................................20 39、油漆、喷漆工安全操作规程 ......................................................................................................20 40、电梯安全操作规程.......................................................................................................................21 41、锅炉工安全操作规程...................................................................................................................22 42、空压机工安全操作规程...............................................................................................................22 43、行车、电动葫芦工安全操作规程..............................................................................................23 44、叉车驾驶员安全操作规程...........................................................................................................24 45、配电工安全操作规程...................................................................................................................25 46、电工安全操作规程.......................................................................................................................25 47、电焊工安全操作规程...................................................................................................................26 48、气焊 ( 割 ) 工安全操作规程....................................................................................................27 49、机修工安全操作规程...................................................................................................................27 50、钻床工安全操作规程...................................................................................................................28 51、砂轮机安全操作规程...................................................................................................................29 52、高处作业工安全操作规程...........................................................................................................30

分类:安全操作规程 行业:其它行业 文件类型:Word 文件大小:534 KB 时间:2025-11-21 价格:¥5.00

安全管理资料-4钢筋冷拉机安全技术交底GDAQ330404

钢筋冷拉机安全技术交底 GDAQ330404 施工单位: 工程名称 分部分项 工  程 工种 一、进入施工现场必须遵守安全操作规程和安全生产纪律,特种作业人员必须持证上岗。 二、根据冷拉钢筋的直径,合理选用卷扬机。卷扬机安装平整,前后地锚牢固可靠,钢丝绳导向滑轮和被 拉钢筋方向成直角。卷扬机的位置必须使操作人员能见到全部冷拉场地,距离冷拉钢筋中心线不少于 5m。 三、电箱离卷扬机不大于 3m,接线正确,保护接零可靠,触电保护器动作灵敏,电源电线绝缘良好,无破 皮、漏电现象。 四、冷拉场地在两端地锚外侧应设置警戒区,装设防护栏及警告标志。严禁无关人员在此停留或通过。 五、操作人员在作业时必须戴安全帽,穿胶鞋,不准赤脚或穿拖鞋,距被拉钢筋至少 2m 以外。 六、作业前,应检查冷拉夹具、夹齿必须完好无损,滑轮、拖拉小车应润滑灵活,拉钩、地锚及防护装置 应齐全牢固,确认良好后,方可作业。 七、用延伸率控制的装置,必须安装明显有效的限位装置和标志,并要有专人负责指挥。 八、卷扬机操作人员必须看到指挥人员发出信号,并待所有人员离开危险区后方可作业。冷拉应低速、缓 慢、均匀地进行,随时注意停机信号或见到有人进入危险区时,应立即停拉,并稍稍放松卷扬钢丝绳。 九、松开钢筋夹具时,操作人员应站在钢筋一侧,防止钢筋射人。 十、夜间作业应有足够照明,灯具应设在张拉危险区外,高度不低于 5m,灯泡应加防护罩,电源导线不得 挂、搭、压任何物品,不得拖地,不准用裸线。 十一、卷扬机应有防雨、防水措施。 十二、作业后,应放松卷扬机钢丝绳,拉闸切断电源,锁好开关箱。 十三、现场补充交底内容: 交底人签字: 日 期: 接受人(全员)签字: 注:本交底一式三份,班组、交底人、资料保管员各一份。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:46.5 KB 时间:2025-11-21 价格:¥5.00

安全管理资料-附件6 化工企业生产装置专项事故隐患排查治理导则(试用版)

附件6 化工企业生产装置事故隐患排查治理实施导则(试用版) 目 录 1 目的 ........................................................................................................2 2 范围 ........................................................................................................2 3 定义 ........................................................................................................2 4 职责 ........................................................................................................4 5 事故隐患排查治理基本要求................................................................6 6 事故隐患分类和等级认定....................................................................8 7 事故隐患排查方式、频次...................................................................12 8 事故隐患排查内容..............................................................................14 9 事故隐患的评审和评估......................................................................21 10 事故隐患的报告和统计分析............................................................22 11 事故隐患的处理 ................................................................................23 12 隐患治理项目的验收........................................................................24 13 事故隐患倒查 ....................................................................................24 附件 各专业隐患排查表.........................................................................26 附录 A **公司安全检查台帐 附录 B **公司事故隐患整改台帐 附录 C **公司重大事故隐患整改台帐 附录 D **公司事故隐患整改通知单 附录 E **公司事故隐患等级评审/评价记录表 附录 F **公司安全检查表 1 目的 对生产过程及安全管理中可能存在的人的不安全行为、物的不 安全状态或管理缺陷等进行辨识,以确定隐患、危险、有害因素或 缺陷的存在状态,以及它们转化为事故的条件,以便制定整改措施, 消除或控制隐患和危险、有害因素,保证企业生产安全。 2 范围 本导则适用于生产、使用和储存危险化学品企业(以下简称企 业)生产装置的事故隐患排查治理工作。 3 定义 3.1 问题是指尚未构成事故隐患的小缺陷或不符合,发现后能立即纠 正或整改,即使发生,人员也不会受伤、不会损失工作时间、损失 财产,企业内部声誉不受影响,例如:现场卫生。 3.2 事故隐患是指生产经营单位违反安全生产法律、法规、规章、标准、 规程和安全生产管理制度的规定,或者因其他因素在生产经营活动中 存在可能导致事故发生的人的不安全行为、物的危险状态、场所的不 安全因素和管理上的缺陷。包括: (1)作业场所、设备设施、人的行为及安全管理等方面存在的 不符合国家安全生产法律法规、标准规范和相关规章制度规定的情 况。 (2)法律法规、标准规范及相关制度未作明确规定,企业危害

分类:安全管理制度 行业:化工行业 文件类型:Word 文件大小:588 KB 时间:2025-11-22 价格:¥5.00

安全管理资料-施工现场治安、消防管理制度

现场治安、消防管理制度 1、施工项目根据工程规模组织施工现场义务消防队并确定一名消防、 治安专职管理人员,全面负责现场的治安、消防工作。施工现场实行 逐级防火责任制,杜绝违章加强用火安全管理,。 2、施工现场要建立门卫和巡逻护场制度,实行封闭式管理,护场守 卫人员要佩带值勤标志,非施工人员未经允许不得进入施工现场,施 工人员不得随意将他人或亲属带入现场乱串或居住,现场严禁赌博、 酗酒、传播淫秽物品和打架斗殴。 3、施工人员未经现场负责人或材料部门批准,严禁私自将现场的材 料送给他人或据为已有,无现场保卫部门和材料部门签发的出门证, 不准将物品带出现场。 4、使用电气设备和易燃易爆物品,必须执行防火安全交底制度,指 定防火负责人,配备灭火器材,确保用火安全。 5、施工现场严禁吸烟,动用明火作业要有操作证和用火证,并配备 看火人员和灭火器具。 6、施工现场消防道路畅通,标志明显,按工程特点绘制消防平面图, 配备足够的消防器材,器材配备布局合理,经常维护保养,保证器材 灵敏有效。重要部位有明显的防火宣传标志。 7、现场的消防器材不得随意挪动,必须挪动的须经项目部管理人员 批准,违者按消防管理规定严肃处理。 8、施工现场的材料存放、保管应符合防火的要求,贵重、剧毒、易燃、 易爆、放射性物品要专库储存,分类单独存放,保持通风,库房用电 符合防火规定。不准在库房内调配油漆、稀料。 9、进入施工现场的车辆必须服从现场人员的指挥,不得乱停乱放, 场内必须保证消防通道畅通无阻。 10、建立消防保卫领导小组和义务消防队,各种资料台帐齐全,逐级 落实到人,随时接受上级领导监督检查。进入施工现场的人员必须自 觉遵守和执行防火管理制度和规定。 11、施工现场发生火险、火灾事故,必须按照“四不放过”的原则对 事故进行分析。(事故原因分析不清不放过、群众没有受到教育不放 过、没有防范措施不放过、没有找到事故责任者不放过)。 XXX 项目 年 月 日

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:25 KB 时间:2025-11-25 价格:¥5.00

安全管理资料-4滑升模板安全技术交底GDAQ330204

滑升模板安全技术交底 GDAQ330204 施工单位: 工程名称 分部分项 工  程 工种 一、进入施工现场必须遵守安全操作规程和安全生产纪律,特种作业人员必须持证上岗。 二、滑模施工设计时,必须注意施工过程中结构的稳定和安全。 三、滑升模板在施工前,技术部门必须做好确实可行的施工方案及流程示意,操作人员必须严格遵照执行。 四、滑模施工中,应严格按施工组织设计要求分散堆载,平台不得超载且不应出现不均匀堆载的现象。滑 模施工工程操作人员的上下,应设置可靠楼梯或在建筑物内及时安装楼梯。 五、施工现场应有足够的照明,操作平台上的照明采用 36V 低电压电灯。 六、参加高空作业人员必须经体检合格,凡患有高血压、心脏病及医生认为不适于高空作业者,不得参加 滑模施工。 七、应遵守施工安全操作规程有关规定。滑升模板在提升前应对全部设备装置进行检查,调试妥善后方可 使用,重点放在检查平台的装配、节点、电气及液压系统。 八、平台内、外吊脚手架使用前,应一律安装好轻质牢固的安全网,并将安全网靠壁,经验收后方可使用。 九、为了防止高空物体坠落伤人,筒身内底部,一般在 2.5m 高外搭设保护棚,应十分可靠,并在上部铺一 层 6~8mm 钢板防护。 十、设备应敷设接地线装置,平台上振动器、电机等应做接地或接零保护。 十一、通信设备除电铃和信号灯外,还应装备 3~4 台步话机。 十二、施工人员必须服从统一指挥,不得擅自操作液压设备和机械设备。滑升模板在提升时,应统一指挥, 并有专人负责监测千斤顶,滑升中出现不正常情况时,立即停止滑升,找出原因并采取相应措施后方准继续滑升。 十三、现场补充交底内容: 交底人签字: 日 期: 接受人(全员)签字: 注:本交底一式三份,班组、交底人、资料保管员各一份。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:45.5 KB 时间:2025-11-26 价格:¥5.00

安全管理资料-林业企业生产安全检查标准表

林业企业生产安全检查标准表 项目 检查内容 检查方 法 检查依据 处罚依据 处罚标准 一、安 全管 理 1、各级安全生产 领导组织机构健全。 即:单位有安全生产 委员会,基层有安全 生产领导小组。 2、落实安全生产 责任。各单位按照 “党政同责、一岗双 责、齐抓共管”和“管 行业必须管安全,管 业务必须管安全,管 生产经营必须管安 全”的要求,建立, 单位主要领导为第 一责任人,同级副职 为分管领域安全生 产负责人的责任体 系。 3、按照中华人民 共和国安全生产法 规定,设置安全生产 管理机构或配备专 (兼)职业安全生产 管理人员。(1)从业 人员超过 300 人应 设置安全管理机构 或者配备专职安全 生产管理人员。(2) 从 业 人 员 未 达 到 300 人的,应配备专 职或者兼职安全生 产管理人员,或者委 托工程技术人员提 供安全管理服务。应 查 看 有 关文件、 资料,现 场检查。 《 安 全 生 法》,第一章 总则第 3、 4、 5、 6、7 条 第二章生产 经营单位的 安全生产保 障,第十八 条 第二十一、 第二十二条。 《 安 全 生 法》其他条 款。 移交有关执 法监察部门, 按照《安全生 产法》第九十 一条第九十 二条、第九十 三条、第九十 四条 第九十一条 生产经营单位的 主要负责人未履 行本法规定的安 全生产管理职责 的,责令限期改 正;逾期未改正 的,处二万元以 上五万元以下的 罚款,责令生产 经营单位停产停 业整顿。 生产经营单位的 主要负责人有前 款违法行为,导 致发生生产安全 事故的,给予撤 职处分;构成犯 罪的,依照刑法 有关规定追究刑 事责任。 生产经营单位的 主要负责人依照 前款规定受刑事 处罚或者撤职处 分的,自刑罚执 行完毕或者受处 分之日起,五年 内不得担任任何 生产经营单位的 主要负责人;对 重大、特别重大 生产安全事故负 有责任的,终身

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:34.6 KB 时间:2025-11-27 价格:¥5.00

安全管理资料-13钢筋冷挤压连接机安全操作规程GDAQ340213

钢筋冷挤压连接机安全操作规程 GDAQ340213 一、有下列情况之一时,应对挤压机的挤压力进行标定: (一)新挤压设备使用前; (二)旧挤压设备大修后; (三)油压表受损或强烈振动后; (四)套筒压痕异常且查不出其他原因时; (五)挤压设备使用超过一年; (六)挤压的接头数超过 5000 个。 二、设备使用前后的拆装过程中,超高压油管两端的接头及压接钳、换向阀的进出油接头,应保持清洁,并 应及时用专用防尘帽封好。超高压油管的弯曲半径不得小于 250mm,扣压接头处不得扭转,且不得有死弯。 三、压力表应定期检查、测定误差不应大于 5%。 四、挤压机液压系统的高压胶管不得荷重拖拉、弯折和受到尖利物体刻划。 五、压模、套管与钢筋应相互配套使用,压模上应有相对应的连接钢筋规格标记。 六、挤压前准备工作: (一)钢筋端头的锈、泥砂、油污等杂物应清理干净; (二)钢筋与套筒应先进行试套,当钢筋有马蹄、弯折或纵肋尺寸过大时,应预先进行矫正或用砂轮打磨; 不同直径钢筋的套筒不得串用; (三)钢筋端部应划出定位标记与检查标记,定位标记与钢筋端头的距离应为套筒长度一半,检查标记与定 位标记的距离宜为 20mm; (四)检查挤压设备情况,应进行试压,符合要求后方可作业。 七、挤压操作应符合下列要求: (一)钢筋挤压连接宜先在地面上挤压一端套筒,在施工作业区插入待接钢筋后再挤压另一端套筒。 (二)压接钳就位时,应对准套筒压痕位置的标记,并应与钢筋轴线保持垂直; (三)挤压顺序宜从套筒中部开始,并逐渐向端部挤压; (四)挤压作业人员不得随意改变挤压力、压接道数或挤压顺序。 八、作业后应收拾好成品、套筒和压模,清理场地,切断电源,锁好开关箱,最后将挤压机和挤压钳放到指 定地点。

分类:安全操作规程 行业:其它行业 文件类型:Word 文件大小:26.5 KB 时间:2025-11-27 价格:¥5.00

3-6职业卫生培训教材、培训记录、考试试卷、照片等资料

职业健康教育培训内容 一、全体人员职业健康基本知识培训的主要内容:   1.国家和地方政府有关职业健康法律、法规、标准;   2.公司职业健康规章制度;   3.职业健康安全管理基础及专业技术知识;   4.本公司生产特点、物料特性、主要危害因素;   5.职业卫生安全操作规程和注意事项;   6.安全设施和防护器材及劳动防护用品的使用知识;   7.典型事故案例、预防事故及事故应急处理措施; 8.卫生保健、自救、互救和职业病预防常识。 二、新入厂员工三级职业健康教育培训内容   1.国家和地方政府有关职业健康法律、法规、标准;   2.本公司职业健康规章制度;   3.职业健康专业技术知识及本车间职业健康管理制度;   4. 本公司生产特点、物料特性、主要危害因素;   5.本车间生产概况,本岗位(装置)生产流程及职业健康注意事项, 本岗位(工种)安全操作规程;   6. 防护设施和防护器材及劳动防护用品的使用知识;   7.典型事故案例、预防事故及事故应急处理措施;   8.卫生保健、自救、互救和职业病预防常识。    新入厂员工必须经过三级职业健康安全管理培训并考核合格, 方可分配工作。凡考核不合格者须重新进行培训考核。 三、管理负责人和职业健康专业管理人员的职业卫生培训内容 四、特种作业人员的职业健康培训内容 五、外来人员的职业健康主要培训内容   1、结合本公司教育培训内容   2.针对施工区域特性和施工特点提出的施工安全卫生要求; 3.施工中必须遵守的职业健康规定; 六、违章违纪人员、严重违章人员   应培训的内容应重新进行职业健康安全教育,并加强职业危害事 故的培训,经考试合格后重新取得上岗资格。

分类:安全培训材料 行业:其它行业 文件类型:Word 文件大小:54 KB 时间:2025-11-29 价格:¥5.00

安全管理资料-6装卸工作安全技术交底GDAQ330906

装卸工作安全技术交底 GDAQ330906 施工单位: 工程名称 分部分项 工  程 工种 一、进入施工现场必须遵守安全操作规程和安全生产纪律。 二、搬运工在搬运前必须认真学习本操作规程中的装卸要求,并遵照执行,对零星装卸也要符合安全运输 的有关规定。 三、起重搬运较大各种大小设备时,必须统一规定口号、信号,统一指挥进行操作。 四、起重搬运工具,使用前必须进行检查,不符合安全规定的不准使用。 五、搬运机器,必须查明重量、尺寸、装卸地点后,才能操作。 六、装运各种材料、物件时严禁超载、超高、超宽、超长。装运构件时,必须选好头木,挂好紧线器,防 止物件倒塌造成事故。 七、车辆未停稳,严禁人在车辆上操作或上下扒车,物件堆放要平稳。车辆行驶时,禁止人坐在拦板上或 车顶高处,更不准站在物件的顶头,防止急刹车物件往前突然移动而轧伤人,装运构件,必须选好头木,挂好 紧线器,防止物件倒塌造成事故。 八、密切配合驾驶员,车辆进出照顾前后,倒车、转弯、领车、正常行驶时应注意前后左右马路上的动态。 九、装卸乙炔瓶、氧气瓶时应轻装轻卸,严禁抛、滑、滚、碰。 十、搬运装卸有毒、有害、易燃、易挥发的物品时,装卸工应配备相应的劳动保护用品,如工作服(呢、稠、 防静电)、鞋、手套、帽、防护眼镜、防尘、防毒口罩、防护面具、急救氧气呼吸器、毛巾、肥皂、防护油膏等。 十一、装卸工人每半年应进行一次健康检查,不适合从事某项工作者应调离此项工作岗位。 十二、装卸有毒有害物品时,食物、饮料不得带入施工现场,更不得在现场进餐,下班后应洗漱更衣方可 离开施工现场。 十三、装卸、搬运易燃、易挥发物品时,必须避免暴晒,尽可能在阴天和夜间进行。 十四、休息时,不得钻到车辆下面休息。 十五、现场补充交底内容: 交底人签字: 日 期: 接受人(全员)签字: 注:本交底一式三份,班组、交底人、资料保管员各一份。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:36.5 KB 时间:2025-12-03 价格:¥5.00

安全管理资料-6卷材屋面施工安全技术交底GDAQ330706

卷材屋面施工安全技术交底 GDAQ330706 施工单位: 工程名称 分部分项 工  程 工种 一、进入施工现场必须遵守安全操作规程和安全生产纪律。 二、装卸、搬运、熬制、铺涂沥青必须使用规定的防护用品,所有参加沥青作业的人必须穿工作服、戴手套、 穿劳保鞋并有帆布护盖等,防止皮肤和沥青接触。 三、熬制沥青的地点不得在电线的垂直下方,宜距建筑物 25m 以外。沥青、燃料的堆放场地,离锅不小于 5m。 四、熬油前应清除锅内杂质和积水,熬油处必须配备铁板、干砂、湿麻袋和灭火器等消防器材。 五、熬油必须有人看守,熬油量不得超过锅容量的 3/4。下班熄火,一定要将余焰熄灭,关闭炉门,盖好锅 盖。 六、锅内沥青着火,应立即用铁板盖住,停止鼓风,封闭炉门,熄灭炉火,严禁向燃烧的沥青浇水,应用 干砂或湿麻袋灭火。 七、装运沥青的勺、桶、壶等工具,不得用焊锡,盛油量不得超过容器的 2/3。肩挑或推车时,道路要平坦 畅通,跳板要支牢,要有防滑措施,绳具要结实,垂直运输时附近 10m 范围内禁止站人,层面上的油桶、油壶 必须放置平稳。 八、屋面铺贴卷材,孔洞加盖封严或设防护栏杆,四周临边应设置 1.2m 高的围栏,靠近室面四周沿边应侧 身操作,严禁倒退铺设。 九、六级以上大风时,应停止操作。 十、患皮肤病、眼结膜病以及对沥青严重敏感的工人,不得从事沥青工作。作业过程中发生恶心、头晕、 过敏等,应停止作业。沥青作业每班适当增加间歇时间。 十一、装卸、搬运碎沥青,必须洒水,防止粉末飞扬。 十二、溶化桶装沥青,先将桶盖和气眼全部打开,用铁条串通后,方准烘烤,并经常疏通放油孔和气眼。 严禁火焰与油直接接触。 十三、配制冷底子油,下料应分批、少量、缓慢、不停搅拌,不得超过锅容量的 1/2,温度不得超过 80℃, 并严禁烟火。 十四、现场补充交底内容: 交底人签字: 日 期: 接受人(全员)签字: 注:本交底一式三份,班组、交底人、资料保管员各一份。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:37.5 KB 时间:2025-12-03 价格:¥5.00

安全管理资料-3玻璃工程安全技术交底GDAQ330703

玻璃工程安全技术交底 GDAQ330703 施工单位: 工程名称 分部分项 工  程 工种 一、进入施工现场必须遵守安全操作规程和安全生产纪律。 二、进入施工现场应戴好安全帽。搬运玻璃时,应戴上手套。玻璃应立放紧靠墙面。高空装配及揩擦玻璃时, 必须穿软底鞋,系好安全带,以保安全操作。 三、截割玻璃,应在指定场所进行;大批量玻璃截割时,要有固定的工作室。 四、截下的边角余料及碎块,不得随意乱抛,应集中投入木箱,及时处理。 五、安装玻璃时应带工具袋。木门窗玻璃安装时,严禁将钉子含在口内进行操作。同一垂直面上不得上下 交叉作业。玻璃未固定前,不得歇工或休息,以防工具或玻璃掉落伤人。 六、安装门窗或隔断玻璃时,不得将梯子靠在门窗扇上或玻璃框上操作。脚手架、脚手板、吊篮、长梯、 高凳等,应认真检查是否牢固,绑扎有无松动,梯脚有无防滑护套,人字梯中间有无拉绳,符合要求后方可用 以进行操作。 七、门窗安装玻璃完毕后,随时将风钩挂好或插上插销,以防风吹碰坏玻璃,并将多余玻璃、材料、工具清 入库。 八、玻璃安装时,操作人员应对门窗口及窗台抹灰和其他装饰项目加以保护。门窗玻璃安装完毕后,应有 专人看管维护,检查门窗关启情况。 九、拆除外脚手架、悬挑脚手架和活动吊篮架时,应有预防玻璃被污染及破损的保护措施。。 十、大块玻璃安装完毕后,应在 1.6m 左右高处,粘贴彩色醒目标志,以免误损坏玻璃。对于面积较大、价 格昂贵的特种玻璃,应有妥善保护措施。 十一、在高处安装玻璃,应将玻璃放置平稳,垂直下方禁止通行。安装屋顶采光玻璃,应铺设脚手板或其 他安全措施。 十二、安装门、窗及安装玻璃时严禁操作人员站在樘子、阳台栏板上操作。门、窗临时固定,封填材料未 达到强度,严禁利用门、窗进行攀登; 十三、现场补充交底内容: 交底人签字: 日 期: 接受人(全员)签字: 注:本交底一式三份,班组、交底人、资料保管员各一份。

分类:安全管理制度 行业:建筑加工行业 文件类型:Word 文件大小:36 KB 时间:2025-12-04 价格:¥5.00

安全管理资料-企业消防监督检查表

企业消防监督检查表 项目 检查内容 检查 方法 检查依据 处罚依据 处罚标准 1、依法应当进行消防验收的建设工 程,未经消防验收擅自投入使用,或 者消防验收不合格擅自投入使用的 查看资 料现场 检查 《消防法》第十三条 《消防法》第五十八条第一 款第三项 责令停止使用,并处三 万元以上三十万元以下 罚款。 2、应当进行备案的建设工程,建设 单位在竣工后未依照消防法规定报 公安机关消防机构备案的 查看资 料现场 检查 《消防法》第十三条 《消防法》第五十八条第二 款 责令限期改正,处五千 元以下罚款。 3、应当进行备案的建设工程投入使 用后经公安机关消防机构抽查不合 格,不停止使用的 查看资 料现场 检查 《消防法》第十三条 《消防法》第五十八条第一 款第四项 责令停止使用,并处三 万元以上三十万元以下 罚款。 一、消 防许 可及 验收 备案 4、公众聚集场所未经消防安全检查 或者经检查不符合消防安全要求,擅 自投入使用、营业的 查看资 料现场 检查 《消防法》第十五条 《消防法》第五十八条第一 款第五项 责令停产停业,并处三 万元以上三十万元以下 罚款。 二、消 防安 全管 1、是否建立消防安全制 度 不履行消 防安全职 责逾期未 查看资 料现场 《消防法》第十六条、第 十七条、第十八条、第二 《消防法》第六十七条 对其直接负责的主管人 员和其他直接责任人员 依法给予处分或者给予 理 2、是否建立灭火和应急 疏散预案 3、是否确定承担灭火和 组织疏散任务的人员 4、是否按规定进行消防 演练 5、消防设施、器材、消 防安全标志是否定期组 织维修保养 6、是否按规定开展防火 检查 7、消防安全重点单位是 否按规定建立员工消防 安全培训记录 8、消防安全重点单位是 否确定消防安全管理人 9、消防安全重点单位是 否按规定开展防火巡查 改 检查 十一条第二款 警告处罚。

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:25 KB 时间:2025-12-05 价格:¥5.00

岗位安全责任制资料合集-【汇编】热源厂安全目标责任书(21页)

安全目标责任状 为加强本企业的安全管理工作,根据“谁主管,谁负责” 的原则和认真贯彻“安全第一,预防为主”的安全生产方针, 强化安全生产责任制,以预防、杜绝各类事故的发生,保障 国家、集体和个人的财产及生命安全,保障公司经济又好又 快发展,依据相关安全生产法律法规要求,结合公司年度经 营计划,特签订 2017 年度安全生产目标责任状。 一、工作目标 1、 重大人身伤亡事故为零。 2、 重大火灾事故为零。 3、 重大爆炸事故为零。 4、 重大交通事故为零。 5、 重大生产事故为零。 6、 重大设备事故为零。 7、 多人急性中毒事故为零。 8、 轻伤率小于 3‰。 9、 最大限度地减少一般事故,安全隐患的整改率达 95%以上。 二、安全管理责任内容及责任目标: 1、对于各类工伤事故,部门(热源厂)负责人必须执行“四 不放过”原则进行调查处理。(即:发生事故未查出原因不 放过,事故责任者未进行严肃处理不放过,本人和员工未受 到教育不放过,未采取措施不放过)。 2、新进员工 “三级安全教育”(入厂教育、热源车间教 育、班组教育)、工伤职工的复工教育、改变工种和四新安 全教育、特种作业人员上岗持证率达 100%。 3、事故隐患按期整改率达 95%以上。对发现的不安全隐 患要及时组织整改,无力整改的要采取有效的安全防范措 施,并及时上报。 4、杜绝各种违章指挥。 5、严格执行职工伤亡事故管理制度,当发生职工伤亡事 故、火灾事故和道路交通事故等,必须按伤亡事故的报告程 序逐级上报。 6、监督压力容器、起重机械、厂内机动车辆在安全检验 周期内,防尘、防毒设备设施运行完好率 85%。 7、督导各岗位严格执行本岗位的安全规程及各种安全制 度。 8、日常工作与安全管理工作发生矛盾时,要把安全工作 放到首位。 9、定期组织安全学习,学习安全规程,总结前一阶段安 全工作,布置今后的安全工作。 10、总经理安排的其他工作。 三、考核与奖惩:

分类:安全管理制度 行业:其它行业 文件类型:Word 文件大小:58 KB 时间:2025-12-11 价格:¥5.00

安全管理资料-24流动式起重机司机安全操作规程GDAQ340124

流动式起重机司机安全操作规程 GDAQ340124 流动式起重机含:履带式起重机、轮胎式起重机、汽车式起重机等。 一、起重机操作人员应经培训考试合格取得特种作业人员操作证后,凭操作证操作,严禁无证开机。 二、流动式起重机发动机启动前应分开离合器,并将各操纵杆放在空档位置上。同机操作人员互相联系好 后方可启动。 三、履带式起重机吊物流动时,臂杆应在履带正前方,离地高度不得超过 50cm,回转、臂杆、吊钩的制动 器必须刹住。起重机不得作远距离运输使用。 四、流动式起重机流动拐弯时不得过快过急。接近满负荷时,严禁转弯,下坡时严禁空档滑行。 五、用变换档位起落臂杆操纵的起重机,严禁在起重臂未停稳时,变换档位,以防滑杆。 六、轮胎式、汽车式起重机禁止吊物行驶。工作完毕起腿、回转臂杆不得同时进行。 七、汽车式起重机行驶时,应将臂杆放在支架上,吊钩挂在保险杠的挂钩上,并将钢丝绳拉紧。 八、汽车式全液压起重机还必须遵守下列规定: (一)作业前应将地面处理平坦放好支腿,调平机架。支腿未完全伸出时,禁止作业。 (二)有负荷时,严禁伸缩臂杆。接近满负荷时,应检查臂杆的挠度。回转不得急速和紧急制动,起落臂杆 应缓慢。 (三)操作时,应锁住离合器操纵杆,防止离合器突然松开。 九、遇有下列情况严禁起吊: (一)起重指挥信号不明或乱指挥不吊; (二)超负荷不吊; (三)工件紧固不牢不吊; (四)吊物上有人不吊; (五)安全装置不灵不吊; (六)工件埋在地下不吊; (七)斜拉工件不吊; (八)光线阴暗看不清不吊; (九)小配件或短料盛过满不吊; (十)棱角物件没有采取包垫等护角措施不吊。

分类:安全操作规程 行业:其它行业 文件类型:Word 文件大小:27 KB 时间:2025-12-12 价格:¥5.00